Novarly ParcelRenewable sites

Renewable sitesShelford Landfill Scheme

Shelford Landfill Scheme

Shelford Landfill Scheme is operational in Canterbury with a recorded capacity of 1.9 MW, and has been generating since 2001-12-30.

1.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2001-12-30
Landfill Gas
Technology
Brett Waste Management Ltd
Canterbury
Authority
England

Planning and build timeline

Application submitted1996-08-01
Permission granted1997-10-27
15 months after submission
Operational2001-12-30
50 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Shelford Generation Plant II
Landfill Gas · Operational
80.2 km
Woodlands Farm Solar Park
Solar Photovoltaics · Operational
103.5 km
Littlebourne
Solar Photovoltaics · Operational
174.1 km
Owls Hatch Road
Solar Photovoltaics · Operational
486 km
Molehill Farm
Solar Photovoltaics · Operational
186.6 km
Nickle Farm
Solar Photovoltaics · Operational
0.358.2 km
Grain Harvesters Ltd
Solar Photovoltaics · Operational
19.8 km
St Nicholas Court Farm (AD)
Anaerobic Digestion · Operational
1.211.9 km

How big is Shelford Landfill Scheme?

Shelford Landfill Scheme has a recorded installed capacity of 1.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Shelford Landfill Scheme?

REPD records the operator as Brett Waste Management Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Shelford Landfill Scheme approved and built?

The application was submitted on 1996-08-01. Permission was granted on 1997-10-27, 15 months later. The site became operational on 2001-12-30, 50 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 578.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council