Owls Hatch Road is operational in Canterbury with a recorded capacity of 48 MW, and has been generating since 2015-03-29.

48 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-29
Solar Photovoltaics
Technology
Cubico Sustainable Investments
Canterbury
Authority
England

Planning and build timeline

Application submitted2014-08-22
Permission granted2015-01-30
5 months after submission
Operational2015-03-29
2 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Canterbury’s record on solar

Canterbury has decided 20 solar farms and approved 95%, taking a median of 2.3 months. See every solar farm decision in Canterbury

Other built sites within 15 km

SiteMWDistance
Molehill Farm
Solar Photovoltaics · Operational
181.1 km
Woodlands Farm Solar Park
Solar Photovoltaics · Operational
103.4 km
Shelford Generation Plant II
Landfill Gas · Operational
85.8 km
Shelford Landfill Scheme
Landfill Gas · Operational
1.96 km
Littlebourne
Solar Photovoltaics · Operational
179.2 km
St Nicholas Court Farm (AD)
Anaerobic Digestion · Operational
1.210.1 km
Kentish Flats 2
Wind Offshore · Operational
49.511 km
Kentish Flats�
Wind Offshore · Operational
9012.1 km

How big is Owls Hatch Road?

Owls Hatch Road has a recorded installed capacity of 48 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Owls Hatch Road?

REPD records the operator as Cubico Sustainable Investments. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Owls Hatch Road approved and built?

The application was submitted on 2014-08-22. Permission was granted on 2015-01-30, 5 months later. The site became operational on 2015-03-29, 2 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2255.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council