Renewable sites › Shelford Generation Plant II
Shelford Generation Plant II
Shelford Generation Plant II is operational in Canterbury with a recorded capacity of 8 MW, and has been generating since 2001-12-01.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2001-12-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
- Nutrient-neutrality catchment — Stodmarsh SAC/SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Shelford Landfill Scheme Landfill Gas · Operational | 1.9 | 0.2 km |
Woodlands Farm Solar Park Solar Photovoltaics · Operational | 10 | 3.3 km |
Littlebourne Solar Photovoltaics · Operational | 17 | 4.2 km |
Owls Hatch Road Solar Photovoltaics · Operational | 48 | 5.8 km |
Molehill Farm Solar Photovoltaics · Operational | 18 | 6.4 km |
Nickle Farm Solar Photovoltaics · Operational | 0.35 | 8.3 km |
Grain Harvesters Ltd Solar Photovoltaics · Operational | 1 | 9.9 km |
St Nicholas Court Farm (AD) Anaerobic Digestion · Operational | 1.2 | 11.9 km |
How big is Shelford Generation Plant II?
Shelford Generation Plant II has a recorded installed capacity of 8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Shelford Generation Plant II?
REPD records the operator as ENERGY DEVELOPMENTS (UK) LTD. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Shelford Generation Plant II approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2001-12-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 583.
Novarly Parcel · official public data, read properly · parcel.novarly.com