Shelford Generation Plant II
Shelford Generation Plant II is an operational 8 MW landfill gas site in Canterbury, generating since 1 December 2001. REPD does not record the planning grant date. Operator of record: ENERGY DEVELOPMENTS (UK) LTD.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 1 December 2001 |
Screening a site of your own?
Redline runs the record on your own boundary in Canterbury: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Shelford Generation Plant II’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
- Nutrient-neutrality catchment — Stodmarsh SAC/SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 1.9 | 0.2 km |
Solar Photovoltaics · Operational | 10 | 3.3 km |
Solar Photovoltaics · Operational | 17 | 4.2 km |
Solar Photovoltaics · Operational | 48 | 5.8 km |
Solar Photovoltaics · Operational | 18 | 6.4 km |
Solar Photovoltaics · Operational | 0.35 | 8.3 km |
Solar Photovoltaics · Operational | 1 | 9.9 km |
Anaerobic Digestion · Operational | 1.2 | 11.9 km |
How big is Shelford Generation Plant II?
Shelford Generation Plant II has a recorded installed capacity of 8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Shelford Generation Plant II?
REPD records the operator as ENERGY DEVELOPMENTS (UK) LTD. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Shelford Generation Plant II approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 December 2001.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 583.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode