Avonmouth Resource Recovery Centre (formerly Severn Road) is an operational 34 MW energy-from-waste plant in Bristol, City of, generating since 1 December 2020. Planning permission was granted on 6 April 2011, 17 months after submission. Operator of record: Viridor.

34 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2020
EfW Incineration
Technology
Viridor
Bristol, City of
Authority
England

Planning and build timeline

Application submitted5 November 2009
Permission granted6 April 2011
17 months after submission
Operational1 December 2020
116 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Bristol, City of: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Avonmouth Resource Recovery Centre (formerly Severn Road)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
1.80.4 km
Wind Onshore · Operational
4.21.1 km
Wind Onshore · Operational
51.1 km
Battery · Operational
321.3 km
EfW Incineration · Operational
321.5 km
Solar Photovoltaics · Operational
1.81.7 km
Solar Photovoltaics · Under Construction
3.811.7 km
Anaerobic Digestion · Operational
101.9 km

How big is Avonmouth Resource Recovery Centre (formerly Severn Road)?

Avonmouth Resource Recovery Centre (formerly Severn Road) has a recorded installed capacity of 34 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Avonmouth Resource Recovery Centre (formerly Severn Road)?

REPD records the operator as Viridor. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Avonmouth Resource Recovery Centre (formerly Severn Road) approved and built?

The application was submitted on 5 November 2009. Permission was granted on 6 April 2011, 17 months later. The site became operational on 1 December 2020, 116 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1008.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode