Renewable sites › Seamer Wind Farm - Hambleton
Seamer Wind Farm - Hambleton
Seamer Wind Farm - Hambleton is operational in Stockton-on-Tees with a recorded capacity of 4 MW, and has been generating since 2012-11-01.
Planning and build timeline
| Application submitted | 2009-03-27 |
| Permission granted | 2009-09-18 6 months after submission |
| Operational | 2012-11-01 37 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — Teesmouth and Cleveland Coast SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Seamer Windfarm - Stockton on Tees Wind Onshore · Operational | 6 | 0.3 km |
Lambs Hill Wind Onshore · Operational | 8 | 7 km |
Eaglescliffe Solar Farm Solar Photovoltaics · Operational | 5 | 7.8 km |
Albert Road Rooftop Solar Panels Solar Photovoltaics · Operational | 0.18 | 8.8 km |
Teesside Green Energy Plant (Waste AD) Anaerobic Digestion · Operational | 4.8 | 9.6 km |
Port Clarence Biomass Plant Biomass (dedicated) · Under Construction | 40 | 10.4 km |
Billingham Chemical Works EfW Incineration · Operational | 12 | 10.6 km |
Imperial Park Anaerobic Digestion · Operational | 5.1 | 10.8 km |
How big is Seamer Wind Farm - Hambleton?
Seamer Wind Farm - Hambleton has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Seamer Wind Farm - Hambleton?
REPD records the operator as Infinis, previously Broadview Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Seamer Wind Farm - Hambleton approved and built?
The application was submitted on 2009-03-27. Permission was granted on 2009-09-18, 6 months later. The site became operational on 2012-11-01, 37 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3791.