Sandy Lane Generation Plant
Sandy Lane Generation Plant is operational in Bromsgrove with a recorded capacity of 2 MW, and has been generating since 2006-08-01.
Planning and build timeline
| Application submitted | 1999-12-21 |
| Permission granted | 2000-07-25 7 months after submission |
| Operational | 2006-08-01 72 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — Bromsgrove
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Bumble Hole Lane, Dodford - Solar PV Solar Photovoltaics · Operational | 0.67 | 3.2 km |
Cradley Heath Advanced Conversion Technologies · Operational | 1.1 | 9.5 km |
Waresley Landfill Site Landfill Gas · Operational | 1.6 | 11.2 km |
EnviRecover EfW Incineration · Operational | 15.5 | 11.5 km |
Edwin Richards Landfill Scheme Landfill Gas · Operational | 1.8 | 11.8 km |
Dudley EfW EfW Incineration · Operational | 7.4 | 12.9 km |
Arthur Street - Solar Panels Solar Photovoltaics · Operational | 0.19 | 13.6 km |
DPD Distribution Centre Solar Photovoltaics · Operational | 1 | 14.3 km |
How big is Sandy Lane Generation Plant?
Sandy Lane Generation Plant has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Sandy Lane Generation Plant?
REPD records the operator as ENERGY DEVELOPMENTS (UK) LTD/Cleanaway. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Sandy Lane Generation Plant approved and built?
The application was submitted on 1999-12-21. Permission was granted on 2000-07-25, 7 months later. The site became operational on 2006-08-01, 72 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 560.