Sandy Lane Generation Plant

Sandy Lane Generation Plant is operational in Bromsgrove with a recorded capacity of 2 MW, and has been generating since 2006-08-01.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 2006-08-01
Landfill Gas
Technology
ENERGY DEVELOPMENTS (UK) LTD/Cleanaway
Bromsgrove
Authority
England

Planning and build timeline

Application submitted1999-12-21
Permission granted2000-07-25
7 months after submission
Operational2006-08-01
72 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Bumble Hole Lane, Dodford - Solar PV
Solar Photovoltaics · Operational
0.673.2 km
Cradley Heath
Advanced Conversion Technologies · Operational
1.19.5 km
Waresley Landfill Site
Landfill Gas · Operational
1.611.2 km
EnviRecover
EfW Incineration · Operational
15.511.5 km
Edwin Richards Landfill Scheme
Landfill Gas · Operational
1.811.8 km
Dudley EfW
EfW Incineration · Operational
7.412.9 km
Arthur Street - Solar Panels
Solar Photovoltaics · Operational
0.1913.6 km
DPD Distribution Centre
Solar Photovoltaics · Operational
114.3 km

How big is Sandy Lane Generation Plant?

Sandy Lane Generation Plant has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Sandy Lane Generation Plant?

REPD records the operator as ENERGY DEVELOPMENTS (UK) LTD/Cleanaway. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Sandy Lane Generation Plant approved and built?

The application was submitted on 1999-12-21. Permission was granted on 2000-07-25, 7 months later. The site became operational on 2006-08-01, 72 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 560.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council