Arthur Street - Solar Panels is an operational 0.19 MW solar farm in Redditch, generating since 1 May 2022. Planning permission was granted on 28 March 2022, 2 months after submission. Operator of record: Springmasters Limited.

0.19 MW
Capacity
as recorded in REPD
Operational
Status
since 1 May 2022
Solar Photovoltaics
Technology
Springmasters Limited
Redditch
Authority
England

Planning and build timeline

Application submitted31 January 2022
Permission granted28 March 2022
2 months after submission
Operational1 May 2022
1 months after consent

Screening a site of your own?

RedlineUK · £39

Redditch approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Arthur Street - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Redditch’s record on solar

Redditch has decided 7 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Redditch

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
0.22.7 km
Solar Photovoltaics · Operational
0.6711.9 km
Landfill Gas · Operational
213.6 km
Solar Photovoltaics · Operational
4.813.8 km

How big is Arthur Street - Solar Panels?

Arthur Street - Solar Panels has a recorded installed capacity of 0.19 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Arthur Street - Solar Panels?

REPD records the operator as Springmasters Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Arthur Street - Solar Panels approved and built?

The application was submitted on 31 January 2022. Permission was granted on 28 March 2022, 2 months later. The site became operational on 1 May 2022, 1 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10776.

Novarly Parcel · official public data, read properly · parcel.novarly.com