Bradenstoke solar park

Bradenstoke solar park is an operational 69.8 MW solar farm in Wiltshire, generating since 21 September 2016. Planning permission was granted on 13 November 2014, 4 months after submission. Operator of record: Defence Infrastructure Organisation / BSR.

69.8 MW
Capacity
as recorded in REPD
Operational
Status
since 21 September 2016
Solar Photovoltaics
Technology
Defence Infrastructure Organisation / BSR
Wiltshire
Authority
England

Planning and build timeline

Application submitted23 July 2014
Permission granted13 November 2014
4 months after submission
Operational21 September 2016
22 months after consent

Screening a site of your own?

RedlineUK · £39

Wiltshire approves 93% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bradenstoke solar park’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wiltshire’s record on solar

Wiltshire has decided 103 solar farms and approved 93%, taking a median of 4 months. See every solar farm decision in Wiltshire

Other built sites within 15 km

SiteMWDistance
Advanced Conversion Technologies · Under Construction
66 km
Solar Photovoltaics · Operational
56.2 km
Solar Photovoltaics · Operational
9.66.3 km
Solar Photovoltaics · Operational
127.5 km
Landfill Gas · Operational
3.57.6 km
Landfill Gas · Operational
27.6 km
Solar Photovoltaics · Operational
57.8 km
Solar Photovoltaics · Operational
58.6 km

How big is Bradenstoke solar park?

Bradenstoke solar park has a recorded installed capacity of 69.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bradenstoke solar park?

REPD records the operator as Defence Infrastructure Organisation / BSR. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bradenstoke solar park approved and built?

The application was submitted on 23 July 2014. Permission was granted on 13 November 2014, 4 months later. The site became operational on 21 September 2016, 22 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2203.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode