Renewable sitesRock Farm / Goldborough Farm (Rookwood)

Rock Farm / Goldborough Farm (Rookwood)

Rock Farm / Goldborough Farm (Rookwood) is an operational 5 MW solar farm in Wiltshire, generating since 2 March 2015. Planning permission was granted on 7 July 2014, 7 months after submission. Operator of record: Good Energy Generation.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2 March 2015
Solar Photovoltaics
Technology
Good Energy Generation
Wiltshire
Authority
England

Planning and build timeline

Application submitted20 December 2013
Permission granted7 July 2014
7 months after submission
Operational2 March 2015
8 months after consent

Screening a site of your own?

RedlineUK · £39

Wiltshire approves 93% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Rock Farm / Goldborough Farm (Rookwood)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wiltshire’s record on solar

Wiltshire has decided 103 solar farms and approved 93%, taking a median of 4 months. See every solar farm decision in Wiltshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
52.5 km
Solar Photovoltaics · Operational
123 km
Solar Photovoltaics · Operational
414.8 km
Advanced Conversion Technologies · Under Construction
65.1 km
Solar Photovoltaics · Under Construction
1.25.6 km
Solar Photovoltaics · Operational
4.85.6 km
Battery · Operational
49.95.9 km
Solar Photovoltaics · Operational
10.56.2 km

How big is Rock Farm / Goldborough Farm (Rookwood)?

Rock Farm / Goldborough Farm (Rookwood) has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Rock Farm / Goldborough Farm (Rookwood)?

REPD records the operator as Good Energy Generation. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Rock Farm / Goldborough Farm (Rookwood) approved and built?

The application was submitted on 20 December 2013. Permission was granted on 7 July 2014, 7 months later. The site became operational on 2 March 2015, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1834.