Salcey Solar Farm

Salcey Solar Farm is operational in Milton Keynes with a recorded capacity of 5 MW, and has been generating since 2014-09-25.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-09-25
Solar Photovoltaics
Technology
NextEnergy Capital
Milton Keynes
Authority
England

Planning and build timeline

Application submitted2013-12-02
Permission granted2014-03-07
3 months after submission
Operational2014-09-25
7 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Milton Keynes’s record on solar

Milton Keynes has decided 46 solar farms and approved 91%, taking a median of 1.8 months. See every solar farm decision in Milton Keynes

Other built sites within 15 km

SiteMWDistance
Salcey Solar Farm
Battery · Operational
13.6 km
Manor Farm (Horton)
Solar Photovoltaics · Operational
53.6 km
Bulls Head Farm North
Solar Photovoltaics · Operational
4.73.8 km
Littlewood Farm
Solar Photovoltaics · Operational
144 km
Rectory Farm/Emberton
Solar Photovoltaics · Operational
94.5 km
Hyde Farm
Solar Photovoltaics · Operational
54.9 km
Milton Keynes Wind Farm
Wind Onshore · Operational
145 km
The Kickles
Solar Photovoltaics · Operational
55.7 km

How big is Salcey Solar Farm?

Salcey Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Salcey Solar Farm?

REPD records the operator as NextEnergy Capital. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Salcey Solar Farm approved and built?

The application was submitted on 2013-12-02. Permission was granted on 2014-03-07, 3 months later. The site became operational on 2014-09-25, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1878.