Novarly ParcelRenewable sites

Renewable sitesSalcey Solar Farm

Salcey Solar Farm

Salcey Solar Farm is operational in Milton Keynes with a recorded capacity of 1 MW, and has been generating since 2017-12-01.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-12-01
Battery
Technology
Anesco
Milton Keynes
Authority
England

Planning and build timeline

Application submitted2016-03-17
Permission grantednot recorded
Operational2017-12-01

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Milton Keynes’s record on battery storage

Milton Keynes has decided 28 battery storage schemes and approved 82%, taking a median of 1.8 months. See every battery storage scheme decision in Milton Keynes

Other built sites within 15 km

SiteMWDistance
Bulls Head Farm North
Solar Photovoltaics · Operational
4.70.7 km
Littlewood Farm
Solar Photovoltaics · Operational
142.3 km
Stonepit Farm
Solar Photovoltaics · Operational
53.1 km
Salcey Solar Farm
Solar Photovoltaics · Operational
53.6 km
Manor Farm (Horton)
Solar Photovoltaics · Operational
53.6 km
M1 Wind Farm
Wind Onshore · Operational
7.24 km
East Lodge Farm, Quinton Road - Anaerobic Digestion Facility
Anaerobic Digestion · Under Construction
5 km
Land East of Horton Road
Solar Photovoltaics · Operational
4.96.5 km

How big is Salcey Solar Farm?

Salcey Solar Farm has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Salcey Solar Farm?

REPD records the operator as Anesco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Salcey Solar Farm approved and built?

The application was submitted on 2016-03-17. REPD does not record a grant date. The site became operational on 2017-12-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6888.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council