Hyde Farm

Hyde Farm is an operational 5 MW solar farm in Milton Keynes, generating since 16 March 2017. Planning permission was granted on 12 January 2016, 5 months after submission. Operator of record: Conergy.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 16 March 2017
Solar Photovoltaics
Technology
Conergy
Milton Keynes
Authority
England

Planning and build timeline

Application submitted7 August 2015
Permission granted12 January 2016
5 months after submission
Operational16 March 2017
14 months after consent

Screening a site of your own?

RedlineUK · £39

Milton Keynes approves 91% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Hyde Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Milton Keynes’s record on solar

Milton Keynes has decided 46 solar farms and approved 91%, taking a median of 1.8 months. See every solar farm decision in Milton Keynes

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
94.5 km
Solar Photovoltaics · Operational
54.9 km
Wind Onshore · Operational
145 km
Solar Photovoltaics · Operational
55.3 km
Solar Photovoltaics · Operational
4.97.1 km
Solar Photovoltaics · Operational
4.77.8 km
Battery · Operational
17.9 km
Solar Photovoltaics · Operational
148.9 km

How big is Hyde Farm?

Hyde Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hyde Farm?

REPD records the operator as Conergy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hyde Farm approved and built?

The application was submitted on 7 August 2015. Permission was granted on 12 January 2016, 5 months later. The site became operational on 16 March 2017, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5685.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode