Novarly ParcelRenewable sites

Renewable sitesMilton Keynes Wind Farm

Milton Keynes Wind Farm

Milton Keynes Wind Farm is operational in Milton Keynes with a recorded capacity of 14 MW, and has been generating since 2010-09-25.

14 MW
Capacity
as recorded in REPD
Operational
Status
since 2010-09-25
Wind Onshore
Technology
Gravis Capital Management
Milton Keynes
Authority
England

Planning and build timeline

Application submitted2006-08-18
Permission granted2008-01-14
17 months after submission
Operational2010-09-25
32 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Rectory Farm/Emberton
Solar Photovoltaics · Operational
90.6 km
Hyde Farm
Solar Photovoltaics · Operational
55 km
Salcey Solar Farm
Solar Photovoltaics · Operational
55 km
The Kickles
Solar Photovoltaics · Operational
55.6 km
Caldecote Farm - Storage & Distribution Unit
Solar Photovoltaics · Under Construction
0.267 km
Manor Farm (Horton)
Solar Photovoltaics · Operational
58 km
Cranfield University - Solar Farm
Solar Photovoltaics · Operational
0.448 km
University Way, Cranfield - Solar Array
Solar Photovoltaics · Operational
0.888 km

How big is Milton Keynes Wind Farm?

Milton Keynes Wind Farm has a recorded installed capacity of 14 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Milton Keynes Wind Farm?

REPD records the operator as Gravis Capital Management. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Milton Keynes Wind Farm approved and built?

The application was submitted on 2006-08-18. Permission was granted on 2008-01-14, 17 months later. The site became operational on 2010-09-25, 32 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2968.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council