Renewable sites › Littlewood Farm
Littlewood Farm
Littlewood Farm is operational in Milton Keynes with a recorded capacity of 14 MW, and has been generating since 2015-03-26.
Planning and build timeline
| Application submitted | 2014-06-04 |
| Permission granted | 2014-10-03 4 months after submission |
| Operational | 2015-03-26 6 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Milton Keynes’s record on solar
Milton Keynes has decided 46 solar farms and approved 91%, taking a median of 1.8 months. See every solar farm decision in Milton Keynes →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Salcey Solar Farm Battery · Operational | 1 | 2.3 km |
Stonepit Farm Solar Photovoltaics · Operational | 5 | 3 km |
Bulls Head Farm North Solar Photovoltaics · Operational | 4.7 | 3.1 km |
Salcey Solar Farm Solar Photovoltaics · Operational | 5 | 4 km |
The Kickles Solar Photovoltaics · Operational | 5 | 5.5 km |
M1 Wind Farm Wind Onshore · Operational | 7.2 | 5.5 km |
Manor Farm (Horton) Solar Photovoltaics · Operational | 5 | 5.7 km |
East Lodge Farm, Quinton Road - Anaerobic Digestion Facility Anaerobic Digestion · Under Construction | — | 6.6 km |
How big is Littlewood Farm?
Littlewood Farm has a recorded installed capacity of 14 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Littlewood Farm?
REPD records the operator as 3C Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Littlewood Farm approved and built?
The application was submitted on 2014-06-04. Permission was granted on 2014-10-03, 4 months later. The site became operational on 2015-03-26, 6 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2182.
Novarly Parcel · official public data, read properly · parcel.novarly.com