Cowley Complex, Stockton on Tees
Cowley Complex, Stockton on Tees is under construction in Stockton-on-Tees with a recorded capacity of 120 MW.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — Teesmouth and Cleveland Coast SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Stockton-on-Tees’s record on solar
Stockton-on-Tees has decided 19 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Stockton-on-Tees →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
High Meadow Farm Solar Photovoltaics · Operational | 4 | 2.5 km |
Walkway Wind Onshore · Operational | 14 | 5.7 km |
Butterwick Moor Wind Onshore · Operational | 20.5 | 5.7 km |
Red Gap Moor Wind Farm Wind Onshore · Operational | 12.5 | 6 km |
Stob House Farm Solar Photovoltaics · Operational | 4.9 | 6.6 km |
Billingham Chemical Works EfW Incineration · Operational | 12 | 7.9 km |
Moor House Wind Farm Wind Onshore · Operational | 12 | 8 km |
Eaglescliffe Solar Farm Solar Photovoltaics · Operational | 5 | 8.3 km |
How big is Cowley Complex, Stockton on Tees?
Cowley Complex, Stockton on Tees has a recorded installed capacity of 120 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Cowley Complex, Stockton on Tees?
REPD records the operator as Sonnedix Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Cowley Complex, Stockton on Tees approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 16393.