Novarly ParcelRenewable sites

Renewable sitesHigh Volts Wind Farm

High Volts Wind Farm

High Volts Wind Farm is an operational 5.5 MW onshore wind farm in Hartlepool, generating since 1 December 2003. Planning permission was granted on 27 March 2002, 10 months after submission. Operator of record: E.ON UK.

5.5 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2003
Wind Onshore
Technology
E.ON UK
Hartlepool
Authority
England

Planning and build timeline

Application submitted15 May 2001
Permission granted27 March 2002
10 months after submission
Operational1 December 2003
20 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Hartlepool: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with High Volts Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
12.55.4 km
Solar Photovoltaics · Operational
4.96.7 km
Wind Onshore · Operational
20.57.1 km
Wind Onshore · Operational
147.1 km
Solar Photovoltaics · Operational
57.1 km
Anaerobic Digestion · Operational
5.17.9 km
Wind Onshore · Operational
5.29.2 km
Solar Photovoltaics · Under Construction
1.349.4 km

How big is High Volts Wind Farm?

High Volts Wind Farm has a recorded installed capacity of 5.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates High Volts Wind Farm?

REPD records the operator as E.ON UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was High Volts Wind Farm approved and built?

The application was submitted on 15 May 2001. Permission was granted on 27 March 2002, 10 months later. The site became operational on 1 December 2003, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3495.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode