Renewable sitesDerriford Hospital

Derriford Hospital

Derriford Hospital is operational in Plymouth with a recorded capacity of 1.5 MW, and has been generating since 2014-10-01.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-10-01
Biomass (dedicated)
Technology
Plymouth Hospital NHS Trust
Plymouth
Authority
England

Planning and build timeline

Application submitted2013-09-18
Permission granted2013-12-10
3 months after submission
Operational2014-10-01
10 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Dartmoor Bio Power
Advanced Conversion Technologies · Operational
3.93.9 km
Warleigh Barton Solar Farm
Solar Photovoltaics · Operational
53.9 km
Ernesettle Solar Farm
Solar Photovoltaics · Operational
4.14.9 km
Chelson Meadow Gas to Energy Scheme
Landfill Gas · Operational
1.85.1 km
Chelson Meadow 2
Landfill Gas · Operational
1.45.1 km
North Yard EfW
EfW Incineration · Operational
22.55.5 km
Newnham Estate
Solar Photovoltaics · Operational
146.1 km
Princess Yachts Limited - Solar PV system
Solar Photovoltaics · Under Construction
0.76.4 km

How big is Derriford Hospital?

Derriford Hospital has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Derriford Hospital?

REPD records the operator as Plymouth Hospital NHS Trust. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Derriford Hospital approved and built?

The application was submitted on 2013-09-18. Permission was granted on 2013-12-10, 3 months later. The site became operational on 2014-10-01, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 64.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council