Renewable sites › Derriford Hospital
Derriford Hospital
Derriford Hospital is operational in Plymouth with a recorded capacity of 1.5 MW, and has been generating since 2014-10-01.
Planning and build timeline
| Application submitted | 2013-09-18 |
| Permission granted | 2013-12-10 3 months after submission |
| Operational | 2014-10-01 10 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Dartmoor Bio Power Advanced Conversion Technologies · Operational | 3.9 | 3.9 km |
Warleigh Barton Solar Farm Solar Photovoltaics · Operational | 5 | 3.9 km |
Ernesettle Solar Farm Solar Photovoltaics · Operational | 4.1 | 4.9 km |
Chelson Meadow Gas to Energy Scheme Landfill Gas · Operational | 1.8 | 5.1 km |
Chelson Meadow 2 Landfill Gas · Operational | 1.4 | 5.1 km |
North Yard EfW EfW Incineration · Operational | 22.5 | 5.5 km |
Newnham Estate Solar Photovoltaics · Operational | 14 | 6.1 km |
Princess Yachts Limited - Solar PV system Solar Photovoltaics · Under Construction | 0.7 | 6.4 km |
How big is Derriford Hospital?
Derriford Hospital has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Derriford Hospital?
REPD records the operator as Plymouth Hospital NHS Trust. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Derriford Hospital approved and built?
The application was submitted on 2013-09-18. Permission was granted on 2013-12-10, 3 months later. The site became operational on 2014-10-01, 10 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 64.