Renewable sitesPriddy Road Farm Biomass Boiler (Retrospective)

Priddy Road Farm Biomass Boiler (Retrospective)

Priddy Road Farm Biomass Boiler (Retrospective) is an operational biomass plant in Somerset, generating since 29 January 2014. Planning permission was granted on 8 March 2021, 5 months after submission. Operator of record: Private Developer.

Capacity
as recorded in REPD
Operational
Status
since 29 January 2014
Biomass (dedicated)
Technology
Private Developer
Somerset
Authority
England

Planning and build timeline

Application submitted9 October 2020
Permission granted8 March 2021
5 months after submission
Operational29 January 2014

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Somerset: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Priddy Road Farm Biomass Boiler (Retrospective)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
22.9 km
Solar Photovoltaics · Operational
72.9 km
Solar Photovoltaics · Operational
2.64.3 km
Solar Photovoltaics · Operational
5.45 km
Solar Photovoltaics · Operational
6.57.8 km
Solar Photovoltaics · Operational
3.98 km
Biomass (dedicated) · Under Construction
3.98.9 km
Solar Photovoltaics · Under Construction
59.3 km

How big is Priddy Road Farm Biomass Boiler (Retrospective)?

REPD does not record an installed capacity for Priddy Road Farm Biomass Boiler (Retrospective).

Who operates Priddy Road Farm Biomass Boiler (Retrospective)?

REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Priddy Road Farm Biomass Boiler (Retrospective) approved and built?

The application was submitted on 9 October 2020. Permission was granted on 8 March 2021, 5 months later. The site became operational on 29 January 2014.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8241.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode