Lodge Farm Solar Farm
Lodge Farm Solar Farm is under construction in Somerset with a recorded capacity of 5 MW.
Planning and build timeline
| Application submitted | 2011-05-09 |
| Permission granted | 2011-12-06 7 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — Brue Catchment
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Somerset’s record on solar
Somerset has decided 147 solar farms and approved 86%, taking a median of 3 months. See every solar farm decision in Somerset →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
New Row Farm Solar Photovoltaics · Operational | 3.9 | 1.6 km |
Burges Lane, Stoke St Michael - Solar Array Panels Solar Photovoltaics · Under Construction | 1.78 | 2.3 km |
Framptons Limited Energy Centre Biomass (dedicated) · Under Construction | 3.9 | 2.8 km |
Crapnell Farm Solar Farm Solar Photovoltaics · Operational | 5.4 | 5.1 km |
Land at Soho Farm Solar Photovoltaics · Operational | 1.5 | 5.6 km |
Pitts Farm Solar Photovoltaics · Operational | 2.6 | 5.7 km |
Pylle Southern solar park (Lower Easton Farm) Solar Photovoltaics · Operational | 5 | 7 km |
Shooters Bottom Wind Park Wind Onshore · Operational | 2 | 7.7 km |
How big is Lodge Farm Solar Farm?
Lodge Farm Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Lodge Farm Solar Farm?
REPD records the operator as Ecotricity. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Lodge Farm Solar Farm approved and built?
The application was submitted on 2011-05-09. Permission was granted on 2011-12-06, 7 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1611.