Lodge Farm Solar Farm

Lodge Farm Solar Farm is under construction in Somerset with a recorded capacity of 5 MW.

5 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Ecotricity
Somerset
Authority
England

Planning and build timeline

Application submitted2011-05-09
Permission granted2011-12-06
7 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Somerset’s record on solar

Somerset has decided 147 solar farms and approved 86%, taking a median of 3 months. See every solar farm decision in Somerset

Other built sites within 15 km

SiteMWDistance
New Row Farm
Solar Photovoltaics · Operational
3.91.6 km
Burges Lane, Stoke St Michael - Solar Array Panels
Solar Photovoltaics · Under Construction
1.782.3 km
Framptons Limited Energy Centre
Biomass (dedicated) · Under Construction
3.92.8 km
Crapnell Farm Solar Farm
Solar Photovoltaics · Operational
5.45.1 km
Land at Soho Farm
Solar Photovoltaics · Operational
1.55.6 km
Pitts Farm
Solar Photovoltaics · Operational
2.65.7 km
Pylle Southern solar park (Lower Easton Farm)
Solar Photovoltaics · Operational
57 km
Shooters Bottom Wind Park
Wind Onshore · Operational
27.7 km

How big is Lodge Farm Solar Farm?

Lodge Farm Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lodge Farm Solar Farm?

REPD records the operator as Ecotricity. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lodge Farm Solar Farm approved and built?

The application was submitted on 2011-05-09. Permission was granted on 2011-12-06, 7 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1611.

Novarly Parcel · official public data, read properly · parcel.novarly.com