Renewable sites › Framptons Limited Energy Centre
Framptons Limited Energy Centre
Framptons Limited Energy Centre is under construction in Somerset with a recorded capacity of 3.9 MW.
Planning and build timeline
| Application submitted | 2020-11-20 |
| Permission granted | 2021-10-07 11 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
- Nutrient-neutrality catchment — Brue Catchment
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
New Row Farm Solar Photovoltaics · Operational | 3.9 | 2 km |
Lodge Farm Solar Farm Solar Photovoltaics · Under Construction | 5 | 2.8 km |
Crapnell Farm Solar Farm Solar Photovoltaics · Operational | 5.4 | 4 km |
Pylle Southern solar park (Lower Easton Farm) Solar Photovoltaics · Operational | 5 | 4.5 km |
Pitts Farm Solar Photovoltaics · Operational | 2.6 | 4.7 km |
Burges Lane, Stoke St Michael - Solar Array Panels Solar Photovoltaics · Under Construction | 1.78 | 5.1 km |
Shooters Bottom Wind Park Wind Onshore · Operational | 2 | 8.3 km |
Land at Soho Farm Solar Photovoltaics · Operational | 1.5 | 8.4 km |
How big is Framptons Limited Energy Centre?
Framptons Limited Energy Centre has a recorded installed capacity of 3.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Framptons Limited Energy Centre?
REPD records the operator as Framptons Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Framptons Limited Energy Centre approved and built?
The application was submitted on 2020-11-20. Permission was granted on 2021-10-07, 11 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8183.