Renewable sites › Prestop Park Farm
Prestop Park Farm
Prestop Park Farm is an operational 16 MW solar farm in North West Leicestershire, generating since 21 March 2015. Planning permission was granted on 30 September 2014, 3 months after submission. Operator of record: Foresight.
Planning and build timeline
| Application submitted | 11 July 2014 |
| Permission granted | 30 September 2014 3 months after submission |
| Operational | 21 March 2015 6 months after consent |
Screening a site of your own?
North West Leicestershire approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Prestop Park Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
- Nutrient-neutrality catchment — River Mease SAC
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North West Leicestershire’s record on solar
North West Leicestershire has decided 28 solar farms and approved 96%, taking a median of 2.7 months. See every solar farm decision in North West Leicestershire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 3 | 0.6 km |
Solar Photovoltaics · Operational | 5 | 2.2 km |
Solar Photovoltaics · Operational | 0.24 | 3.4 km |
Solar Photovoltaics · Operational | 5 | 3.9 km |
Solar Photovoltaics · Operational | 2.8 | 4 km |
Battery · Operational | 10 | 4.2 km |
Landfill Gas · Operational | 1.1 | 4.4 km |
Solar Photovoltaics · Operational | 5 | 4.6 km |
How big is Prestop Park Farm?
Prestop Park Farm has a recorded installed capacity of 16 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Prestop Park Farm?
REPD records the operator as Foresight. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Prestop Park Farm approved and built?
The application was submitted on 11 July 2014. Permission was granted on 30 September 2014, 3 months later. The site became operational on 21 March 2015, 6 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2200.