Lount/Smoile

Lount/Smoile is operational in North West Leicestershire with a recorded capacity of 1.1 MW, and has been generating since 2003-07-21.

1.1 MW
Capacity
as recorded in REPD
Operational
Status
since 2003-07-21
Landfill Gas
Technology
SITA UK
North West Leicestershire
Authority
England

Planning and build timeline

Application submitted2000-03-09
Permission granted2000-06-21
3 months after submission
Operational2003-07-21
37 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Lount solar farm
Solar Photovoltaics · Operational
2.81 km
Land at Ingles Hill Farm
Solar Photovoltaics · Operational
33.8 km
Hill Farm - Energy Barn
Battery · Operational
104.4 km
Prestop Park Farm
Solar Photovoltaics · Operational
164.4 km
Land at Hill Farm
Solar Photovoltaics · Operational
1.24.5 km
Lower Fields Mushroom Farm
Solar Photovoltaics · Operational
0.35.1 km
Short Hazel Solar Farm
Solar Photovoltaics · Operational
55.3 km
Ashby Solar Farm (a)
Solar Photovoltaics · Operational
55.8 km

How big is Lount/Smoile?

Lount/Smoile has a recorded installed capacity of 1.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lount/Smoile?

REPD records the operator as SITA UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lount/Smoile approved and built?

The application was submitted on 2000-03-09. Permission was granted on 2000-06-21, 3 months later. The site became operational on 2003-07-21, 37 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 712.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council