Lount/Smoile is an operational 1.1 MW landfill gas site in North West Leicestershire, generating since 21 July 2003. Planning permission was granted on 21 June 2000, 3 months after submission. Operator of record: SITA UK.
Planning and build timeline
| Application submitted | 9 March 2000 |
| Permission granted | 21 June 2000 3 months after submission |
| Operational | 21 July 2003 37 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in North West Leicestershire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Lount/Smoile’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 2.8 | 1 km |
Solar Photovoltaics · Operational | 3 | 3.8 km |
Battery · Operational | 10 | 4.4 km |
Solar Photovoltaics · Operational | 16 | 4.4 km |
Solar Photovoltaics · Operational | 1.2 | 4.5 km |
Solar Photovoltaics · Operational | 0.3 | 5.1 km |
Solar Photovoltaics · Operational | 5 | 5.3 km |
Solar Photovoltaics · Operational | 5 | 5.8 km |
How big is Lount/Smoile?
Lount/Smoile has a recorded installed capacity of 1.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Lount/Smoile?
REPD records the operator as SITA UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Lount/Smoile approved and built?
The application was submitted on 9 March 2000. Permission was granted on 21 June 2000, 3 months later. The site became operational on 21 July 2003, 37 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 712.