Midland Lead, Kiln Way - Solar Photovoltaic Panels is an operational 0.24 MW solar farm in South Derbyshire, generating since 1 November 2022. Planning permission was granted on 23 January 2023, 5 months after submission. Operator of record: Cactus Energy.

0.24 MW
Capacity
as recorded in REPD
Operational
Status
since 1 November 2022
Solar Photovoltaics
Technology
Cactus Energy
South Derbyshire
Authority
England

Planning and build timeline

Application submitted10 August 2022
Permission granted23 January 2023
5 months after submission
Operational1 November 2022

Screening a site of your own?

RedlineUK · £39

South Derbyshire approves 67% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Midland Lead, Kiln Way - Solar Photovoltaic Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Derbyshire’s record on solar

South Derbyshire has decided 12 solar farms and approved 67%, taking a median of 4.9 months. See every solar farm decision in South Derbyshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
52.5 km
Landfill Gas · Operational
1.63.4 km
Solar Photovoltaics · Operational
163.4 km
Solar Photovoltaics · Operational
2.53.7 km
Solar Photovoltaics · Operational
34 km
Solar Photovoltaics · Operational
54.2 km
Solar Photovoltaics · Operational
56.5 km
Solar Photovoltaics · Operational
2.87.2 km

How big is Midland Lead, Kiln Way - Solar Photovoltaic Panels?

Midland Lead, Kiln Way - Solar Photovoltaic Panels has a recorded installed capacity of 0.24 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Midland Lead, Kiln Way - Solar Photovoltaic Panels?

REPD records the operator as Cactus Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Midland Lead, Kiln Way - Solar Photovoltaic Panels approved and built?

The application was submitted on 10 August 2022. Permission was granted on 23 January 2023, 5 months later. The site became operational on 1 November 2022.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12050.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode