Renewable sites › Midland Lead, Kiln Way - Solar Photovoltaic Panels
Midland Lead, Kiln Way - Solar Photovoltaic Panels
Midland Lead, Kiln Way - Solar Photovoltaic Panels is operational in South Derbyshire with a recorded capacity of 0.24 MW, and has been generating since 2022-11-01.
Planning and build timeline
| Application submitted | 2022-08-10 |
| Permission granted | 2023-01-23 5 months after submission |
| Operational | 2022-11-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
- Nutrient-neutrality catchment — River Mease SAC
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
South Derbyshire’s record on solar
South Derbyshire has decided 12 solar farms and approved 67%, taking a median of 4.9 months. See every solar farm decision in South Derbyshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Short Hazel Solar Farm Solar Photovoltaics · Operational | 5 | 2.5 km |
Bretby Power Landfill Gas · Operational | 1.6 | 3.4 km |
Prestop Park Farm Solar Photovoltaics · Operational | 16 | 3.4 km |
Land at Coton Park Colliery Solar Photovoltaics · Operational | 2.5 | 3.7 km |
Land at Ingles Hill Farm Solar Photovoltaics · Operational | 3 | 4 km |
Shortheath Solar Park Solar Photovoltaics · Operational | 5 | 4.2 km |
Ashby Solar Farm (a) Solar Photovoltaics · Operational | 5 | 6.5 km |
Lount solar farm Solar Photovoltaics · Operational | 2.8 | 7.2 km |
How big is Midland Lead, Kiln Way - Solar Photovoltaic Panels?
Midland Lead, Kiln Way - Solar Photovoltaic Panels has a recorded installed capacity of 0.24 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Midland Lead, Kiln Way - Solar Photovoltaic Panels?
REPD records the operator as Cactus Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Midland Lead, Kiln Way - Solar Photovoltaic Panels approved and built?
The application was submitted on 2022-08-10. Permission was granted on 2023-01-23, 5 months later. The site became operational on 2022-11-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12050.