Renewable sitesMidland Lead, Kiln Way - Solar Photovoltaic Panels

Midland Lead, Kiln Way - Solar Photovoltaic Panels

Midland Lead, Kiln Way - Solar Photovoltaic Panels is operational in South Derbyshire with a recorded capacity of 0.24 MW, and has been generating since 2022-11-01.

0.24 MW
Capacity
as recorded in REPD
Operational
Status
since 2022-11-01
Solar Photovoltaics
Technology
Cactus Energy
South Derbyshire
Authority
England

Planning and build timeline

Application submitted2022-08-10
Permission granted2023-01-23
5 months after submission
Operational2022-11-01

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Derbyshire’s record on solar

South Derbyshire has decided 12 solar farms and approved 67%, taking a median of 4.9 months. See every solar farm decision in South Derbyshire

Other built sites within 15 km

SiteMWDistance
Short Hazel Solar Farm
Solar Photovoltaics · Operational
52.5 km
Bretby Power
Landfill Gas · Operational
1.63.4 km
Prestop Park Farm
Solar Photovoltaics · Operational
163.4 km
Land at Coton Park Colliery
Solar Photovoltaics · Operational
2.53.7 km
Land at Ingles Hill Farm
Solar Photovoltaics · Operational
34 km
Shortheath Solar Park
Solar Photovoltaics · Operational
54.2 km
Ashby Solar Farm (a)
Solar Photovoltaics · Operational
56.5 km
Lount solar farm
Solar Photovoltaics · Operational
2.87.2 km

How big is Midland Lead, Kiln Way - Solar Photovoltaic Panels?

Midland Lead, Kiln Way - Solar Photovoltaic Panels has a recorded installed capacity of 0.24 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Midland Lead, Kiln Way - Solar Photovoltaic Panels?

REPD records the operator as Cactus Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Midland Lead, Kiln Way - Solar Photovoltaic Panels approved and built?

The application was submitted on 2022-08-10. Permission was granted on 2023-01-23, 5 months later. The site became operational on 2022-11-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12050.