Novarly ParcelRenewable sites

Renewable sitesPressock Farm

Pressock Farm

Pressock Farm is an operational 5 MW solar farm in Angus, generating since 28 March 2017. Planning permission was granted on 8 October 2015, 6 months after submission. Operator of record: Green Power Consultants.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 28 March 2017
Solar Photovoltaics
Technology
Green Power Consultants
Angus
Authority
Scotland

Planning and build timeline

Application submitted20 April 2015
Permission granted8 October 2015
6 months after submission
Operational28 March 2017
18 months after consent

Screening a site of your own?

RedlineUK · £39

Angus approves 97% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Pressock Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Angus’s record on solar

Angus has decided 30 solar farms and approved 97%, taking a median of 4 months. See every solar farm decision in Angus

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
106.8 km
Solar Photovoltaics · Operational
56.8 km
Solar Photovoltaics · Operational
58.1 km
Landfill Gas · Operational
28.5 km
Wind Onshore · Under Construction
19.1 km
Hydrogen · Under Construction
0.89.1 km
Battery · Operational
359.3 km
Battery · Under Construction
49.910.4 km

How big is Pressock Farm?

Pressock Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Pressock Farm?

REPD records the operator as Green Power Consultants. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Pressock Farm approved and built?

The application was submitted on 20 April 2015. Permission was granted on 8 October 2015, 6 months later. The site became operational on 28 March 2017, 18 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4969.