Lochhead Landfill Scheme

Lochhead Landfill Scheme is an operational 2 MW landfill gas site in Angus, generating since 1 August 2004. Planning permission was granted on 31 July 2002, 2 months after submission. Operator of record: Natural Power.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 1 August 2004
Landfill Gas
Technology
Natural Power
Angus
Authority
Scotland

Planning and build timeline

Application submitted28 May 2002
Permission granted31 July 2002
2 months after submission
Operational1 August 2004
24 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Angus: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Lochhead Landfill Scheme’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Battery · Under Construction
49.91.9 km
Solar Photovoltaics · Under Construction
56.1 km
Battery · Under Construction
106.1 km
Solar Photovoltaics · Operational
58.5 km
Solar Photovoltaics · Operational
1011.5 km

How big is Lochhead Landfill Scheme?

Lochhead Landfill Scheme has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lochhead Landfill Scheme?

REPD records the operator as Natural Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lochhead Landfill Scheme approved and built?

The application was submitted on 28 May 2002. Permission was granted on 31 July 2002, 2 months later. The site became operational on 1 August 2004, 24 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 763.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode