Renewable sitesPortley Ford Landfill Site

Portley Ford Landfill Site

Portley Ford Landfill Site is operational in West Northamptonshire with a recorded capacity of 1.8 MW, and has been generating since 1996-10-01.

1.8 MW
Capacity
as recorded in REPD
Operational
Status
since 1996-10-01
Landfill Gas
Technology
Biogeneration / Biffa
West Northamptonshire
Authority
England

Planning and build timeline

Application submitted1994-05-10
Permission granted1995-02-08
9 months after submission
Operational1996-10-01
20 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Lowther Farms
Solar Photovoltaics · Operational
1.83.1 km
Winwick
Wind Onshore · Operational
12.33.1 km
Kelmarsh Wind Farm (Resubmission)
Wind Onshore · Operational
12.55.3 km
Pebble Hall Farm - Food Waste AD
Anaerobic Digestion · Operational
47.6 km
Crick Road
Solar Photovoltaics · Under Construction
49.97.6 km
Yelvertoft Wind Farm
Wind Onshore · Operational
168.1 km
Watford Lodge
Wind Onshore · Operational
12.58.4 km
Lilbourne Wind Farm
Wind Onshore · Operational
109.1 km

How big is Portley Ford Landfill Site?

Portley Ford Landfill Site has a recorded installed capacity of 1.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Portley Ford Landfill Site?

REPD records the operator as Biogeneration / Biffa. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Portley Ford Landfill Site approved and built?

The application was submitted on 1994-05-10. Permission was granted on 1995-02-08, 9 months later. The site became operational on 1996-10-01, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 528.