Pogbie Wind Farm 2 is operational in East Lothian with a recorded capacity of 4.8 MW, and has been generating since 2019-03-01.

4.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2019-03-01
Wind Onshore
Technology
Mongoose (formerly Energy Law Unlimited/ Pogbie Windfarm)
East Lothian
Authority
Scotland

Planning and build timeline

Application submitted2015-08-03
Permission granted2016-05-06
9 months after submission
Operational2019-03-01
34 months after consent

East Lothian’s record on onshore wind

East Lothian has decided 5 onshore wind schemes and approved 100%, taking a median of 10.6 months. See every onshore wind scheme decision in East Lothian

Other built sites within 15 km

SiteMWDistance
Pogbie Wind Farm 1
Wind Onshore · Operational
5.12 km
Keith Hill
Wind Onshore · Operational
4.52.7 km
Dun Law
Wind Onshore · Operational
17.23.7 km
Dun Law Extension
Wind Onshore · Operational
29.85.9 km
Howden Farm
Solar Photovoltaics · Operational
0.26.6 km
Toddleburn
Wind Onshore · Operational
27.68.2 km
Fallago Rig
Wind Onshore · Operational
1449.7 km
Pure Malt Products AD
Anaerobic Digestion · Operational
1.513.8 km

How big is Pogbie Wind Farm 2?

Pogbie Wind Farm 2 has a recorded installed capacity of 4.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Pogbie Wind Farm 2?

REPD records the operator as Mongoose (formerly Energy Law Unlimited/ Pogbie Windfarm). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Pogbie Wind Farm 2 approved and built?

The application was submitted on 2015-08-03. Permission was granted on 2016-05-06, 9 months later. The site became operational on 2019-03-01, 34 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5637.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council