Pogbie Wind Farm 2

Pogbie Wind Farm 2 is an operational 4.8 MW onshore wind farm in East Lothian, generating since 1 March 2019. Planning permission was granted on 6 May 2016, 9 months after submission. Operator of record: Mongoose (formerly Energy Law Unlimited/ Pogbie Windfarm).

4.8 MW
Capacity
as recorded in REPD
Operational
Status
since 1 March 2019
Wind Onshore
Technology
Mongoose (formerly Energy Law Unlimited/ Pogbie Windfarm)
East Lothian
Authority
Scotland

Planning and build timeline

Application submitted3 August 2015
Permission granted6 May 2016
9 months after submission
Operational1 March 2019
34 months after consent

Screening a site of your own?

RedlineUK · £39

East Lothian approves 100% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Pogbie Wind Farm 2’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

East Lothian’s record on onshore wind

East Lothian has decided 5 onshore wind schemes and approved 100%, taking a median of 10.6 months. See every onshore wind scheme decision in East Lothian

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
5.12 km
Wind Onshore · Operational
4.52.7 km
Wind Onshore · Operational
17.23.7 km
Wind Onshore · Operational
29.85.9 km
Solar Photovoltaics · Operational
0.26.6 km
Wind Onshore · Operational
27.68.2 km
Wind Onshore · Operational
1449.7 km
Anaerobic Digestion · Operational
1.513.8 km

How big is Pogbie Wind Farm 2?

Pogbie Wind Farm 2 has a recorded installed capacity of 4.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Pogbie Wind Farm 2?

REPD records the operator as Mongoose (formerly Energy Law Unlimited/ Pogbie Windfarm). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Pogbie Wind Farm 2 approved and built?

The application was submitted on 3 August 2015. Permission was granted on 6 May 2016, 9 months later. The site became operational on 1 March 2019, 34 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5637.