Howden Farm is operational in East Lothian with a recorded capacity of 0.2 MW, and has been generating since 2021-01-01.
Planning and build timeline
| Application submitted | 2020-03-05 |
| Permission granted | 2020-04-27 2 months after submission |
| Operational | 2021-01-01 8 months after consent |
East Lothian’s record on solar
East Lothian has decided 6 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in East Lothian →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Pogbie Wind Farm 2 Wind Onshore · Operational | 4.8 | 6.6 km |
Pure Malt Products AD Anaerobic Digestion · Operational | 1.5 | 7.2 km |
Pogbie Wind Farm 1 Wind Onshore · Operational | 5.1 | 8.3 km |
Keith Hill Wind Onshore · Operational | 4.5 | 8.7 km |
Dun Law Wind Onshore · Operational | 17.2 | 10.2 km |
Fallago Rig Wind Onshore · Operational | 144 | 10.3 km |
Dun Law Extension Wind Onshore · Operational | 29.8 | 12.3 km |
Toddleburn Wind Onshore · Operational | 27.6 | 14.8 km |
How big is Howden Farm?
Howden Farm has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Howden Farm?
REPD records the operator as Howden Eggs. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Howden Farm approved and built?
The application was submitted on 2020-03-05. Permission was granted on 2020-04-27, 2 months later. The site became operational on 2021-01-01, 8 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7745.