Novarly ParcelRenewable sites

Renewable sitesPlant 1, G-Tekt Europe Manufacturing Limited -Roof Mounted Solar Panels

Plant 1, G-Tekt Europe Manufacturing Limited -Roof Mounted Solar Panels

Plant 1, G-Tekt Europe Manufacturing Limited -Roof Mounted Solar Panels is a 1 MW solar farm under construction in Tewkesbury. Planning permission was granted on 12 December 2022, 6 months after submission. Operator of record: G-Tekt Europe Manufacturing Limited.

1 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
G-Tekt Europe Manufacturing Limited
Tewkesbury
Authority
England

Planning and build timeline

Application submitted20 June 2022
Permission granted12 December 2022
6 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Tewkesbury approves 92% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Plant 1, G-Tekt Europe Manufacturing Limited -Roof Mounted Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Tewkesbury’s record on solar

Tewkesbury has decided 24 solar farms and approved 92%, taking a median of 5.5 months. See every solar farm decision in Tewkesbury

Other built sites within 15 km

SiteMWDistance
Battery · Operational
1.55.7 km
Biomass (dedicated) · Operational
3.65.8 km
Solar Photovoltaics · Operational
7.5 km
Biomass (dedicated) · Operational
2.18.6 km
EfW Incineration · Operational
14.510.2 km
Solar Photovoltaics · Operational
6.711.4 km
Anaerobic Digestion · Operational
1.612.7 km
Solar Photovoltaics · Operational
3013.1 km

How big is Plant 1, G-Tekt Europe Manufacturing Limited -Roof Mounted Solar Panels?

Plant 1, G-Tekt Europe Manufacturing Limited -Roof Mounted Solar Panels has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Plant 1, G-Tekt Europe Manufacturing Limited -Roof Mounted Solar Panels?

REPD records the operator as G-Tekt Europe Manufacturing Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Plant 1, G-Tekt Europe Manufacturing Limited -Roof Mounted Solar Panels approved and built?

The application was submitted on 20 June 2022. Permission was granted on 12 December 2022, 6 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11646.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode