Renewable sites › Mobile Telephone Exchange (MTX) - Solar Panels
Mobile Telephone Exchange (MTX) - Solar Panels
Mobile Telephone Exchange (MTX) - Solar Panels is operational in Gloucester, and has been generating since 2023-04-01.
Planning and build timeline
| Application submitted | 2022-12-07 |
| Permission granted | not recorded |
| Operational | 2023-04-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Gloucester’s record on solar
Gloucester has decided 16 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Gloucester →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Markley Group (Premiere Kitckens) Biomass Biomass (dedicated) · Operational | 2.1 | 2.5 km |
Javelin Park EfW EfW Incineration · Operational | 14.5 | 4.5 km |
Leeways Solar Photovoltaics · Operational | 0.5 | 7.3 km |
Plant 1, G-Tekt Europe Manufacturing Limited -Roof Mounted Solar Panels Solar Photovoltaics · Under Construction | 1 | 7.5 km |
Stantway Solar Farm Solar Photovoltaics · Operational | 5 | 8.5 km |
Renishaw PLC Factory Solar Photovoltaics · Operational | 0.8 | 9 km |
Highleadon - Solar Arrays & Battery Storage Solar Photovoltaics · Operational | 49.9 | 9.6 km |
Highleadon - Solar Arrays & Battery Storage Battery · Operational | — | 9.6 km |
How big is Mobile Telephone Exchange (MTX) - Solar Panels?
REPD does not record an installed capacity for Mobile Telephone Exchange (MTX) - Solar Panels.
Who operates Mobile Telephone Exchange (MTX) - Solar Panels?
REPD records the operator as Vodafone. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Mobile Telephone Exchange (MTX) - Solar Panels approved and built?
The application was submitted on 2022-12-07. REPD does not record a grant date. The site became operational on 2023-04-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 13662.