Renewable sitesMobile Telephone Exchange (MTX) - Solar Panels

Mobile Telephone Exchange (MTX) - Solar Panels

Mobile Telephone Exchange (MTX) - Solar Panels is an operational solar farm in Gloucester, generating since 1 April 2023. REPD does not record the planning grant date. Operator of record: Vodafone.

Capacity
as recorded in REPD
Operational
Status
since 1 April 2023
Solar Photovoltaics
Technology
Vodafone
Gloucester
Authority
England

Planning and build timeline

Application submitted7 December 2022
Permission grantednot recorded
Operational1 April 2023

Screening a site of your own?

RedlineUK · £39

Gloucester approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Mobile Telephone Exchange (MTX) - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Gloucester’s record on solar

Gloucester has decided 16 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Gloucester

Other built sites within 15 km

SiteMWDistance
Biomass (dedicated) · Operational
2.12.5 km
EfW Incineration · Operational
14.54.5 km
Solar Photovoltaics · Operational
0.57.3 km
Solar Photovoltaics · Under Construction
17.5 km
Solar Photovoltaics · Operational
58.5 km
Solar Photovoltaics · Operational
0.89 km
Battery · Operational
9.6 km
Solar Photovoltaics · Operational
49.99.6 km

How big is Mobile Telephone Exchange (MTX) - Solar Panels?

REPD does not record an installed capacity for Mobile Telephone Exchange (MTX) - Solar Panels.

Who operates Mobile Telephone Exchange (MTX) - Solar Panels?

REPD records the operator as Vodafone. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Mobile Telephone Exchange (MTX) - Solar Panels approved and built?

The application was submitted on 7 December 2022. REPD does not record a grant date. The site became operational on 1 April 2023.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 13662.