Renewable sitesPhilip Dennis Food Service

Philip Dennis Food Service

Philip Dennis Food Service is operational in North Devon with a recorded capacity of 3.8 MW, and has been generating since 2018-05-01.

3.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2018-05-01
Battery
Technology
Philip Dennis Food Service
North Devon
Authority
England

Planning and build timeline

Application submitted2017-10-20
Permission granted2017-12-06
2 months after submission
Operational2018-05-01
5 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Devon’s record on battery storage

North Devon has decided 5 battery storage schemes and approved 100%, taking a median of 1.5 months. See every battery storage scheme decision in North Devon

Other built sites within 15 km

SiteMWDistance
Horsacott Farm Solar Park
Solar Photovoltaics · Operational
6.41.5 km
Hollamoor Farm (PV)
Solar Photovoltaics · Operational
21.9 km
Collacott Farm
Solar Photovoltaics · Operational
4.52.9 km
Litchardon Cross Solar Farm
Solar Photovoltaics · Operational
49.93.2 km
Luscott Barton
Solar Photovoltaics · Operational
135.6 km
Perrigo,Wrafton - Solar Photovoltaic System
Solar Photovoltaics · Operational
0.535.8 km
Exeter Road, Braunton - Solar Panels
Solar Photovoltaics · Under Construction
0.755.8 km
Gammaton Moor Solar farm
Solar Photovoltaics · Under Construction
327.5 km

How big is Philip Dennis Food Service?

Philip Dennis Food Service has a recorded installed capacity of 3.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Philip Dennis Food Service?

REPD records the operator as Philip Dennis Food Service. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Philip Dennis Food Service approved and built?

The application was submitted on 2017-10-20. Permission was granted on 2017-12-06, 2 months later. The site became operational on 2018-05-01, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7099.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council