Renewable sites › Philip Dennis Food Service
Philip Dennis Food Service
Philip Dennis Food Service is an operational 3.8 MW battery storage site in North Devon, generating since 1 May 2018. Planning permission was granted on 6 December 2017, 2 months after submission. Operator of record: Philip Dennis Food Service.
Planning and build timeline
| Application submitted | 20 October 2017 |
| Permission granted | 6 December 2017 2 months after submission |
| Operational | 1 May 2018 5 months after consent |
Screening a site of your own?
North Devon approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Philip Dennis Food Service’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Devon’s record on battery storage
North Devon has decided 5 battery storage schemes and approved 100%, taking a median of 1.5 months. See every battery storage scheme decision in North Devon →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 6.4 | 1.5 km |
Solar Photovoltaics · Operational | 2 | 1.9 km |
Solar Photovoltaics · Operational | 4.5 | 2.9 km |
Solar Photovoltaics · Operational | 49.9 | 3.2 km |
Solar Photovoltaics · Operational | 13 | 5.6 km |
Solar Photovoltaics · Operational | 0.53 | 5.8 km |
Solar Photovoltaics · Under Construction | 0.75 | 5.8 km |
Solar Photovoltaics · Under Construction | 32 | 7.5 km |
How big is Philip Dennis Food Service?
Philip Dennis Food Service has a recorded installed capacity of 3.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Philip Dennis Food Service?
REPD records the operator as Philip Dennis Food Service. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Philip Dennis Food Service approved and built?
The application was submitted on 20 October 2017. Permission was granted on 6 December 2017, 2 months later. The site became operational on 1 May 2018, 5 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7099.