Litchardon Cross Solar Farm

Litchardon Cross Solar Farm is an operational 49.9 MW solar farm in North Devon. Planning permission was granted on 14 May 2021, 10 months after submission. Operator of record: Aura Power / Infinis Energy Services.

49.9 MW
Capacity
as recorded in REPD
Operational
Status
no operational date
Solar Photovoltaics
Technology
Aura Power / Infinis Energy Services
North Devon
Authority
England

Planning and build timeline

Application submitted24 July 2020
Permission granted14 May 2021
10 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

North Devon approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Litchardon Cross Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Devon’s record on solar

North Devon has decided 23 solar farms and approved 96%, taking a median of 4.9 months. See every solar farm decision in North Devon

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
4.51 km
Solar Photovoltaics · Operational
6.42.3 km
Battery · Operational
3.83.2 km
Solar Photovoltaics · Operational
23.3 km
Solar Photovoltaics · Under Construction
324.5 km
Solar Photovoltaics · Operational
4.74.8 km
Solar Photovoltaics · Operational
0.536.2 km
Solar Photovoltaics · Under Construction
0.756.2 km

How big is Litchardon Cross Solar Farm?

Litchardon Cross Solar Farm has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Litchardon Cross Solar Farm?

REPD records the operator as Aura Power / Infinis Energy Services. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Litchardon Cross Solar Farm approved and built?

The application was submitted on 24 July 2020. Permission was granted on 14 May 2021, 10 months later. REPD does not record an operational date.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8101.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode