Novarly ParcelRenewable sites

Renewable sitesExeter Road, Braunton - Solar Panels

Exeter Road, Braunton - Solar Panels

Exeter Road, Braunton - Solar Panels is under construction in North Devon with a recorded capacity of 0.75 MW.

0.75 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Perrigo Wrafton Laboratories
North Devon
Authority
England

Planning and build timeline

Application submitted2021-12-23
Permission granted2022-05-12
5 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Devon’s record on solar

North Devon has decided 23 solar farms and approved 96%, taking a median of 4.9 months. See every solar farm decision in North Devon

Other built sites within 15 km

SiteMWDistance
Perrigo,Wrafton - Solar Photovoltaic System
Solar Photovoltaics · Operational
0.530 km
Luscott Barton
Solar Photovoltaics · Operational
132.7 km
Horsacott Farm Solar Park
Solar Photovoltaics · Operational
6.44.8 km
Collacott Farm
Solar Photovoltaics · Operational
4.55.2 km
West Hill Farm (solar)
Solar Photovoltaics · Operational
7.35.6 km
Blatchworthy Farm
Solar Photovoltaics · Operational
1.55.6 km
Philip Dennis Food Service
Battery · Operational
3.85.8 km
West Hill Farm
Solar Photovoltaics · Operational
2.46.1 km

How big is Exeter Road, Braunton - Solar Panels?

Exeter Road, Braunton - Solar Panels has a recorded installed capacity of 0.75 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Exeter Road, Braunton - Solar Panels?

REPD records the operator as Perrigo Wrafton Laboratories. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Exeter Road, Braunton - Solar Panels approved and built?

The application was submitted on 2021-12-23. Permission was granted on 2022-05-12, 5 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10140.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council