Renewable sites › Exeter Road, Braunton - Solar Panels
Exeter Road, Braunton - Solar Panels
Exeter Road, Braunton - Solar Panels is under construction in North Devon with a recorded capacity of 0.75 MW.
Planning and build timeline
| Application submitted | 2021-12-23 |
| Permission granted | 2022-05-12 5 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Devon’s record on solar
North Devon has decided 23 solar farms and approved 96%, taking a median of 4.9 months. See every solar farm decision in North Devon →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Perrigo,Wrafton - Solar Photovoltaic System Solar Photovoltaics · Operational | 0.53 | 0 km |
Luscott Barton Solar Photovoltaics · Operational | 13 | 2.7 km |
Horsacott Farm Solar Park Solar Photovoltaics · Operational | 6.4 | 4.8 km |
Collacott Farm Solar Photovoltaics · Operational | 4.5 | 5.2 km |
West Hill Farm (solar) Solar Photovoltaics · Operational | 7.3 | 5.6 km |
Blatchworthy Farm Solar Photovoltaics · Operational | 1.5 | 5.6 km |
Philip Dennis Food Service Battery · Operational | 3.8 | 5.8 km |
West Hill Farm Solar Photovoltaics · Operational | 2.4 | 6.1 km |
How big is Exeter Road, Braunton - Solar Panels?
Exeter Road, Braunton - Solar Panels has a recorded installed capacity of 0.75 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Exeter Road, Braunton - Solar Panels?
REPD records the operator as Perrigo Wrafton Laboratories. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Exeter Road, Braunton - Solar Panels approved and built?
The application was submitted on 2021-12-23. Permission was granted on 2022-05-12, 5 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10140.