Gammaton Moor Solar farm
Gammaton Moor Solar farm is under construction in Torridge with a recorded capacity of 32 MW.
Planning and build timeline
| Application submitted | 2021-09-01 |
| Permission granted | 2022-04-19 8 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Torridge’s record on solar
Torridge has decided 28 solar farms and approved 96%, taking a median of 3.6 months. See every solar farm decision in Torridge →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Cleave Farm Solar Park Solar Photovoltaics · Operational | 4.7 | 0.3 km |
Knockworthy Farm Solar Photovoltaics · Operational | 3.5 | 2.7 km |
Chubb Road - Solar Photovoltaic Solar Photovoltaics · Operational | 0.15 | 3.7 km |
Darracott Moor Wind Onshore · Operational | 2.6 | 4.1 km |
Litchardon Cross Solar Farm Solar Photovoltaics · Operational | 49.9 | 4.5 km |
Deep Moor Gas to Energy Landfill Gas · Operational | 2 | 4.8 km |
Deep Moor Landfill Site Solar Photovoltaics · Operational | 2 | 5.3 km |
Collacott Farm Solar Photovoltaics · Operational | 4.5 | 5.4 km |
How big is Gammaton Moor Solar farm?
Gammaton Moor Solar farm has a recorded installed capacity of 32 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Gammaton Moor Solar farm?
REPD records the operator as Lightsource SPV 175 Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Gammaton Moor Solar farm approved and built?
The application was submitted on 2021-09-01. Permission was granted on 2022-04-19, 8 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9785.