Gammaton Moor Solar farm

Gammaton Moor Solar farm is under construction in Torridge with a recorded capacity of 32 MW.

32 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Lightsource SPV 175 Limited
Torridge
Authority
England

Planning and build timeline

Application submitted2021-09-01
Permission granted2022-04-19
8 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Torridge’s record on solar

Torridge has decided 28 solar farms and approved 96%, taking a median of 3.6 months. See every solar farm decision in Torridge

Other built sites within 15 km

SiteMWDistance
Cleave Farm Solar Park
Solar Photovoltaics · Operational
4.70.3 km
Knockworthy Farm
Solar Photovoltaics · Operational
3.52.7 km
Chubb Road - Solar Photovoltaic
Solar Photovoltaics · Operational
0.153.7 km
Darracott Moor
Wind Onshore · Operational
2.64.1 km
Litchardon Cross Solar Farm
Solar Photovoltaics · Operational
49.94.5 km
Deep Moor Gas to Energy
Landfill Gas · Operational
24.8 km
Deep Moor Landfill Site
Solar Photovoltaics · Operational
25.3 km
Collacott Farm
Solar Photovoltaics · Operational
4.55.4 km

How big is Gammaton Moor Solar farm?

Gammaton Moor Solar farm has a recorded installed capacity of 32 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Gammaton Moor Solar farm?

REPD records the operator as Lightsource SPV 175 Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Gammaton Moor Solar farm approved and built?

The application was submitted on 2021-09-01. Permission was granted on 2022-04-19, 8 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9785.