Renewable planning › Battery storage › North Devon
Battery storage planning in North Devon
North Devon has decided 5 battery storage schemes and approved 100% of them, taking a median of 1.5 months to decide. Consented capacity: 5 MW. 1 application still awaiting a decision.
⚠️ Small caseload (5 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How North Devon compares
Against the 137 UK authorities with 5+ battery storage decisions, North Devon sits in the 73rd percentile for approval rate (8 points above the England average) and the 100th percentile for speed.
Decisions by year
Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.
Every recorded scheme (7)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Fishleigh Road, Roundswell Business Park - Battery Energy Storage AMP Clean Energy · 79656 · 1.2 mo to decide | 0.2 | Awaiting Construction | 2025-02-17 |
Greenacres, Roundswell - Micro Energy Storage Project AMP Clean Energy · 79655 · 1.2 mo to decide | 0.2 | Awaiting Construction | 2025-02-17 |
Bucknell Way, Hacche Lane -Battery Energy Storage AMP Clean Energy · 79032 · 3.9 mo to decide | 0.2 | Awaiting Construction | 2024-12-05 |
Higher Slade Road, Lower Slade - Micro Energy Storage Facility AMP Clean Energy · 78983 · 2.4 mo to decide | 0.2 | Awaiting Construction | 2024-10-24 |
St Georges Road - Energy Storage Facility AMP Clean Energy · 79033 | 0.2 | Application Withdrawn | 2024-10-08 |
Petroc, Sticklepath - Battery Storage Petroc College Of Further Education · 78929 | 1 | Application Submitted | 2024-08-15 |
Philip Dennis Food Service Philip Dennis Food Service · 63981 · 1.5 mo to decide | 3.8 | Operational | 2017-12-06 |
Does North Devon approve battery storage schemes?
Yes — of the 5 battery storage schemes North Devon has decided, 100% were approved (5 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a battery storage scheme application take in North Devon?
The median time from application to decision is 1.5 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much battery storage capacity has North Devon consented?
5 MW has been consented across 5 approved schemes. A further 1 application awaits a decision.
Other technologies in North Devon
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.
Novarly Parcel · official public data, read properly · parcel.novarly.com