Renewable sitesPerrigo,Wrafton - Solar Photovoltaic System

Perrigo,Wrafton - Solar Photovoltaic System

Perrigo,Wrafton - Solar Photovoltaic System is operational in North Devon with a recorded capacity of 0.53 MW, and has been generating since 2021-12-01.

0.53 MW
Capacity
as recorded in REPD
Operational
Status
since 2021-12-01
Solar Photovoltaics
Technology
Perrigo
North Devon
Authority
England

Planning and build timeline

Application submitted2021-09-02
Permission granted2021-11-01
2 months after submission
Operational2021-12-01
1 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Devon’s record on solar

North Devon has decided 23 solar farms and approved 96%, taking a median of 4.9 months. See every solar farm decision in North Devon

Other built sites within 15 km

SiteMWDistance
Exeter Road, Braunton - Solar Panels
Solar Photovoltaics · Under Construction
0.750 km
Luscott Barton
Solar Photovoltaics · Operational
132.7 km
Horsacott Farm Solar Park
Solar Photovoltaics · Operational
6.44.8 km
Collacott Farm
Solar Photovoltaics · Operational
4.55.2 km
West Hill Farm (solar)
Solar Photovoltaics · Operational
7.35.6 km
Blatchworthy Farm
Solar Photovoltaics · Operational
1.55.6 km
Philip Dennis Food Service
Battery · Operational
3.85.8 km
West Hill Farm
Solar Photovoltaics · Operational
2.46.1 km

How big is Perrigo,Wrafton - Solar Photovoltaic System?

Perrigo,Wrafton - Solar Photovoltaic System has a recorded installed capacity of 0.53 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Perrigo,Wrafton - Solar Photovoltaic System?

REPD records the operator as Perrigo. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Perrigo,Wrafton - Solar Photovoltaic System approved and built?

The application was submitted on 2021-09-02. Permission was granted on 2021-11-01, 2 months later. The site became operational on 2021-12-01, 1 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9664.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council