Novarly ParcelRenewable sites

Renewable sitesHorsacott Farm Solar Park

Horsacott Farm Solar Park

Horsacott Farm Solar Park is an operational 6.4 MW solar farm in North Devon, generating since 29 March 2013. Planning permission was granted on 30 November 2012, 4 months after submission. Operator of record: Hazel Capital LLP.

6.4 MW
Capacity
as recorded in REPD
Operational
Status
since 29 March 2013
Solar Photovoltaics
Technology
Hazel Capital LLP
North Devon
Authority
England

Planning and build timeline

Application submitted30 July 2012
Permission granted30 November 2012
4 months after submission
Operational29 March 2013
4 months after consent

Screening a site of your own?

RedlineUK · £39

North Devon approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Horsacott Farm Solar Park’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Devon’s record on solar

North Devon has decided 23 solar farms and approved 96%, taking a median of 4.9 months. See every solar farm decision in North Devon

Other built sites within 15 km

SiteMWDistance
Battery · Operational
3.81.5 km
Solar Photovoltaics · Operational
4.51.7 km
Solar Photovoltaics · Operational
49.92.3 km
Solar Photovoltaics · Operational
22.8 km
Solar Photovoltaics · Operational
0.534.8 km
Solar Photovoltaics · Under Construction
0.754.8 km
Solar Photovoltaics · Operational
135.2 km
Solar Photovoltaics · Under Construction
326.8 km

How big is Horsacott Farm Solar Park?

Horsacott Farm Solar Park has a recorded installed capacity of 6.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Horsacott Farm Solar Park?

REPD records the operator as Hazel Capital LLP. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Horsacott Farm Solar Park approved and built?

The application was submitted on 30 July 2012. Permission was granted on 30 November 2012, 4 months later. The site became operational on 29 March 2013, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1591.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode