Horsacott Farm Solar Park

Horsacott Farm Solar Park is operational in North Devon with a recorded capacity of 6.4 MW, and has been generating since 2013-03-29.

6.4 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-03-29
Solar Photovoltaics
Technology
Hazel Capital LLP
North Devon
Authority
England

Planning and build timeline

Application submitted2012-07-30
Permission granted2012-11-30
4 months after submission
Operational2013-03-29
4 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Devon’s record on solar

North Devon has decided 23 solar farms and approved 96%, taking a median of 4.9 months. See every solar farm decision in North Devon

Other built sites within 15 km

SiteMWDistance
Philip Dennis Food Service
Battery · Operational
3.81.5 km
Collacott Farm
Solar Photovoltaics · Operational
4.51.7 km
Litchardon Cross Solar Farm
Solar Photovoltaics · Operational
49.92.3 km
Hollamoor Farm (PV)
Solar Photovoltaics · Operational
22.8 km
Perrigo,Wrafton - Solar Photovoltaic System
Solar Photovoltaics · Operational
0.534.8 km
Exeter Road, Braunton - Solar Panels
Solar Photovoltaics · Under Construction
0.754.8 km
Luscott Barton
Solar Photovoltaics · Operational
135.2 km
Gammaton Moor Solar farm
Solar Photovoltaics · Under Construction
326.8 km

How big is Horsacott Farm Solar Park?

Horsacott Farm Solar Park has a recorded installed capacity of 6.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Horsacott Farm Solar Park?

REPD records the operator as Hazel Capital LLP. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Horsacott Farm Solar Park approved and built?

The application was submitted on 2012-07-30. Permission was granted on 2012-11-30, 4 months later. The site became operational on 2013-03-29, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1591.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council