Renewable sites › Slamseys Energy Storage
Slamseys Energy Storage
Slamseys Energy Storage is under construction in Braintree with a recorded capacity of 10 MW.
Planning and build timeline
| Application submitted | 2017-07-06 |
| Permission granted | 2017-09-15 2 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Braintree’s record on battery storage
Braintree has decided 8 battery storage schemes and approved 100%, taking a median of 3.9 months. See every battery storage scheme decision in Braintree →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Drapers Farm Solar Park Solar Photovoltaics · Operational | 6 | 1.8 km |
Braintree Road, Cressing - Battery Storage Battery · Under Construction | 57 | 4.4 km |
Cressing Solar Farm (Phase 1) Solar Photovoltaics · Operational | 5 | 5.5 km |
Periwinkle Hall - Links Solar photovoltaic farm & Battery storage Battery · Operational | — | 7.1 km |
Periwinkle Hall - Links Solar photovoltaic farm & Battery storage Solar Photovoltaics · Operational | 35 | 7.1 km |
Kentishes Solar Farm Solar Photovoltaics · Operational | 5 | 8.2 km |
Wren Power and Pulp (Rivenhall Airfield) EfW Incineration · Under Construction | 49.8 | 8.5 km |
Wren Power and Pulp (Rivenhall Airfield) Anaerobic Digestion · Under Construction | 1.8 | 8.5 km |
How big is Slamseys Energy Storage?
Slamseys Energy Storage has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Slamseys Energy Storage?
REPD records the operator as Gridserve Energy Storage. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Slamseys Energy Storage approved and built?
The application was submitted on 2017-07-06. Permission was granted on 2017-09-15, 2 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7000.
Novarly Parcel · official public data, read properly · parcel.novarly.com