Slamseys Energy Storage

Slamseys Energy Storage is a 10 MW battery storage site under construction in Braintree. Planning permission was granted on 15 September 2017, 2 months after submission. Operator of record: Gridserve Energy Storage.

10 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Gridserve Energy Storage
Braintree
Authority
England

Planning and build timeline

Application submitted6 July 2017
Permission granted15 September 2017
2 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Braintree approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Slamseys Energy Storage’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Braintree’s record on battery storage

Braintree has decided 8 battery storage schemes and approved 100%, taking a median of 3.9 months. See every battery storage scheme decision in Braintree

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
61.8 km
Battery · Under Construction
574.4 km
Solar Photovoltaics · Operational
55.5 km
Solar Photovoltaics · Operational
357.1 km
Battery · Operational
7.1 km
Solar Photovoltaics · Operational
58.2 km
Anaerobic Digestion · Under Construction
1.88.5 km
EfW Incineration · Under Construction
49.88.5 km

How big is Slamseys Energy Storage?

Slamseys Energy Storage has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Slamseys Energy Storage?

REPD records the operator as Gridserve Energy Storage. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Slamseys Energy Storage approved and built?

The application was submitted on 6 July 2017. Permission was granted on 15 September 2017, 2 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7000.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode