Morrisons Witham - Solar Pv Panels
Morrisons Witham - Solar Pv Panels is an operational 0.19 MW solar farm in Braintree, generating since 1 October 2022. Planning permission was granted on 2 March 2023, 15 months after submission. Operator of record: WM Morrisons Supermarkets Plc.
Planning and build timeline
| Application submitted | 16 November 2021 |
| Permission granted | 2 March 2023 15 months after submission |
| Operational | 1 October 2022 |
Screening a site of your own?
Braintree approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Morrisons Witham - Solar Pv Panels’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Braintree’s record on solar
Braintree has decided 23 solar farms and approved 96%, taking a median of 3.6 months. See every solar farm decision in Braintree →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 5 | 4.3 km |
Anaerobic Digestion · Under Construction | 1.8 | 4.9 km |
EfW Incineration · Under Construction | 49.8 | 4.9 km |
Solar Photovoltaics · Operational | 2.8 | 5.8 km |
Solar Photovoltaics · Operational | 12.2 | 5.8 km |
Battery · Operational | — | 6.2 km |
Solar Photovoltaics · Operational | 35 | 6.2 km |
Solar Photovoltaics · Operational | 6.15 | 8 km |
How big is Morrisons Witham - Solar Pv Panels?
Morrisons Witham - Solar Pv Panels has a recorded installed capacity of 0.19 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Morrisons Witham - Solar Pv Panels?
REPD records the operator as WM Morrisons Supermarkets Plc. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Morrisons Witham - Solar Pv Panels approved and built?
The application was submitted on 16 November 2021. Permission was granted on 2 March 2023, 15 months later. The site became operational on 1 October 2022.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10001.