Renewable sites › Parc Stormy, Stormy Down
Parc Stormy, Stormy Down
Parc Stormy, Stormy Down is operational in Bridgend with a recorded capacity of 2.5 MW.
Planning and build timeline
| Application submitted | 2016-01-04 |
| Permission granted | 2016-08-18 7 months after submission |
| Operational | not recorded |
Bridgend’s record on onshore wind
Bridgend has decided 10 onshore wind schemes and approved 60%, taking a median of 9.3 months. See every onshore wind scheme decision in Bridgend →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Stormy Down (Waste AD) Anaerobic Digestion · Operational | 3 | 0.1 km |
Stormy Down Solar Farm Solar Photovoltaics · Operational | 3.8 | 0.5 km |
Newton Down Wind Onshore · Operational | 5 | 0.6 km |
Tythegston Landfill Site Landfill Gas · Operational | 1.2 | 1.6 km |
Seaview Farm Solar Photovoltaics · Operational | 1.7 | 2.2 km |
Court Colman solar park Solar Photovoltaics · Operational | 15 | 4 km |
Caergarw Farm Solar Photovoltaics · Operational | 3.8 | 4.1 km |
Margam Green Energy Plant Biomass (dedicated) · Operational | 40 | 8.2 km |
How big is Parc Stormy, Stormy Down?
Parc Stormy, Stormy Down has a recorded installed capacity of 2.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Parc Stormy, Stormy Down?
REPD records the operator as Cenin Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Parc Stormy, Stormy Down approved and built?
The application was submitted on 2016-01-04. Permission was granted on 2016-08-18, 7 months later. REPD does not record an operational date.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6013.
Novarly Parcel · official public data, read properly · parcel.novarly.com