Renewable sites › Parc Stormy, Stormy Down
Parc Stormy, Stormy Down
Parc Stormy, Stormy Down is an operational 2.5 MW onshore wind farm in Bridgend. Planning permission was granted on 18 August 2016, 7 months after submission. Operator of record: Cenin Renewables.
Planning and build timeline
| Application submitted | 4 January 2016 |
| Permission granted | 18 August 2016 7 months after submission |
| Operational | not recorded |
Screening a site of your own?
Bridgend approves 60% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Parc Stormy, Stormy Down’s recorded coordinate — swap in your own postcode or coordinates.
Bridgend’s record on onshore wind
Bridgend has decided 10 onshore wind schemes and approved 60%, taking a median of 9.3 months. See every onshore wind scheme decision in Bridgend →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Anaerobic Digestion · Operational | 3 | 0.1 km |
Solar Photovoltaics · Operational | 3.8 | 0.5 km |
Wind Onshore · Operational | 5 | 0.6 km |
Landfill Gas · Operational | 1.2 | 1.6 km |
Solar Photovoltaics · Operational | 1.7 | 2.2 km |
Solar Photovoltaics · Operational | 15 | 4 km |
Solar Photovoltaics · Operational | 3.8 | 4.1 km |
Wind Onshore · Operational | 1.5 | 8.2 km |
How big is Parc Stormy, Stormy Down?
Parc Stormy, Stormy Down has a recorded installed capacity of 2.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Parc Stormy, Stormy Down?
REPD records the operator as Cenin Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Parc Stormy, Stormy Down approved and built?
The application was submitted on 4 January 2016. Permission was granted on 18 August 2016, 7 months later. REPD does not record an operational date.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6013.