Novarly ParcelRenewable planning

Renewable planning Onshore windBridgend

Onshore wind planning in Bridgend

Bridgend has decided 10 onshore wind schemes and approved 60% of them, taking a median of 9.3 months to decide. Consented capacity: 75 MW. 1 application still awaiting a decision.

60%
Approved
6 granted · 4 refused
9.3 mo
Median decision
UK 11.5 mo
75 MW
Consented
76 MW refused
3
Appeals
2 allowed on appeal

How Bridgend compares

Against the 75 UK authorities with 5+ onshore wind decisions, Bridgend sits in the 31st percentile for approval rate (8 points below the England average) and the 80th percentile for speed.

Decisions by year

35Approved — 2 (2011)211Approved — 1 (2013)113Approved — 1 (2015)115Approved — 1 (2016)116Approved — 1 (2023)123
Approved Refused

Onshore wind decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (11)

SchemeMWStatusDecided
Cwm Risca Farm, Tondu - Wind Turbine
Constantine Wind Energy Limited · P/25/597/FUL
0.45Application Submitted2025-10-07
Pant y Wal (Extension)
Pennant Walters · P/20/42/FUL · 36.8 mo to decide
5Awaiting Construction2023-02-09
Parc Stormy, Stormy Down
Cenin Renewables · P/15/868/FUL · 7.5 mo to decide
2.5Operational2016-08-18
Pant y wal extension
Pennant Walters (PYWX) · P/14/293/FUL · 11.1 mo to decide
20Operational2015-04-02
Newton Down
Renewable Energy Partnerships Ltd · P/12/368/FUL · 12.2 mo to decide
5Operational2013-05-24
Fforch Nest Wind Farm pt2
Pennant Walters · 06/1842/10 · 61.1 mo to decide
17.5Operational2011-05-04
Pant y wal
Pennant Wind Energy Ventures (PWEV) · P/06/417/FUL · 61.1 mo to decide
25Operational2011-05-04
Lluest Wen Energy Centre
Private Developer · 02/0704/FUL/DCD · 3.1 mo to decide
2.6Application Refused2002-10-01
Werfa Wind Farm
Amec Wind · 01/887/FUL · 5.7 mo to decide
14.3Application Refused2002-03-19
Ogmore & Garw
AMEC · P/01/887 · 5.5 mo to decide
12Application Refused2002-03-13
Werfa
AMEC · P/01/887/FUL · 5.5 mo to decide
47.5Appeal Refused2002-03-13

Does Bridgend approve onshore wind schemes?

Yes — of the 10 onshore wind schemes Bridgend has decided, 60% were approved (6 granted, 4 refused). The UK-wide rate for onshore wind is 68%.

How long does a onshore wind scheme application take in Bridgend?

The median time from application to decision is 9.3 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has Bridgend consented?

75 MW has been consented across 6 approved schemes, with 76 MW refused. A further 1 application awaits a decision.

Other technologies in Bridgend

Solar in BridgendBattery storage in Bridgend

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.