Packington Solar Farm is an operational 13.9 MW solar farm in North West Leicestershire, generating since 16 March 2015. Planning permission was granted on 20 October 2014, 4 months after submission. Operator of record: Solstice Renewables.

13.9 MW
Capacity
as recorded in REPD
Operational
Status
since 16 March 2015
Solar Photovoltaics
Technology
Solstice Renewables
North West Leicestershire
Authority
England

Planning and build timeline

Application submitted27 June 2014
Permission granted20 October 2014
4 months after submission
Operational16 March 2015
5 months after consent

Screening a site of your own?

RedlineUK · £39

North West Leicestershire approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Packington Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North West Leicestershire’s record on solar

North West Leicestershire has decided 28 solar farms and approved 96%, taking a median of 2.7 months. See every solar farm decision in North West Leicestershire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
51.9 km
Solar Photovoltaics · Operational
0.31.9 km
Battery · Operational
102.5 km
Solar Photovoltaics · Operational
1.22.7 km
Solar Photovoltaics · Operational
35.6 km
Solar Photovoltaics · Operational
165.8 km
Solar Photovoltaics · Operational
2.85.9 km
Solar Photovoltaics · Operational
56 km

How big is Packington Solar Farm?

Packington Solar Farm has a recorded installed capacity of 13.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Packington Solar Farm?

REPD records the operator as Solstice Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Packington Solar Farm approved and built?

The application was submitted on 27 June 2014. Permission was granted on 20 October 2014, 4 months later. The site became operational on 16 March 2015, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2054.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode