Foxcombe Farm Solar Park is an operational 5 MW solar farm in Torridge, generating since 10 June 2013. Planning permission was granted on 11 February 2013, 5 months after submission. Operator of record: Private Developer.
Planning and build timeline
| Application submitted | 18 September 2012 |
| Permission granted | 11 February 2013 5 months after submission |
| Operational | 10 June 2013 4 months after consent |
Screening a site of your own?
Torridge approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Foxcombe Farm Solar Park’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Torridge’s record on solar
Torridge has decided 28 solar farms and approved 96%, taking a median of 3.6 months. See every solar farm decision in Torridge →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 7.5 | 2.5 km |
Solar Photovoltaics · Operational | 3.6 | 4.4 km |
Anaerobic Digestion · Operational | 1.4 | 5 km |
Solar Photovoltaics · Operational | 11.8 | 5.2 km |
Solar Photovoltaics · Operational | 5 | 5.4 km |
Solar Photovoltaics · Operational | 1 | 5.7 km |
Solar Photovoltaics · Operational | 3 | 5.9 km |
Wind Onshore · Operational | 1.5 | 7.1 km |
How big is Foxcombe Farm Solar Park?
Foxcombe Farm Solar Park has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Foxcombe Farm Solar Park?
REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Foxcombe Farm Solar Park approved and built?
The application was submitted on 18 September 2012. Permission was granted on 11 February 2013, 5 months later. The site became operational on 10 June 2013, 4 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1631.