Renewable sitesEASTACOMBE SOLAR FARM

EASTACOMBE SOLAR FARM

EASTACOMBE SOLAR FARM is operational in Torridge with a recorded capacity of 3.6 MW, and has been generating since 2012-07-01.

3.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2012-07-01
Solar Photovoltaics
Technology
The Green Company
Torridge
Authority
England

Planning and build timeline

Application submitted2011-04-11
Permission granted2011-06-30
3 months after submission
Operational2012-07-01
12 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Torridge’s record on solar

Torridge has decided 28 solar farms and approved 96%, taking a median of 3.6 months. See every solar farm decision in Torridge

Other built sites within 15 km

SiteMWDistance
Nethercott Farm
Wind Onshore · Operational
1.53.2 km
West Venn Solar Farm
Solar Photovoltaics · Operational
53.3 km
Derriton Fields Solar Farm
Solar Photovoltaics · Operational
11.84 km
Foxcombe Farm Solar Park
Solar Photovoltaics · Operational
54.4 km
Great Knowle Farm Solar
Solar Photovoltaics · Operational
34.5 km
Whiddon Farm
Solar Photovoltaics · Operational
14.7 km
Land West of Parsonage Wood
Solar Photovoltaics · Operational
4.24.9 km
CRINACOTT SOLAR FARM (Pyworthy)
Solar Photovoltaics · Operational
6.75.1 km

How big is EASTACOMBE SOLAR FARM?

EASTACOMBE SOLAR FARM has a recorded installed capacity of 3.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates EASTACOMBE SOLAR FARM?

REPD records the operator as The Green Company. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was EASTACOMBE SOLAR FARM approved and built?

The application was submitted on 2011-04-11. Permission was granted on 2011-06-30, 3 months later. The site became operational on 2012-07-01, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1610.