Newthorpe Wind Turbine is operational in Broxtowe with a recorded capacity of 2.5 MW, and has been generating since 2014-04-08.

2.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-04-08
Wind Onshore
Technology
Severn Trent Water
Broxtowe
Authority
England

Planning and build timeline

Application submitted2010-12-03
Permission granted2011-07-15
7 months after submission
Operational2014-04-08
33 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Manners Avenue - Solar Panels
Solar Photovoltaics · Operational
0.622.9 km
Long Lane Solar Farm / Nottingham Brick Works
Solar Photovoltaics · Under Construction
174.8 km
Pinnacle Storage Park, Dale Abbey - Solar PV Panels
Solar Photovoltaics · Under Construction
15.6 km
Crompton Road, Ilkeston - Anaerobic Digestion Plant
Anaerobic Digestion · Operational
5.6 km
Bulwell Energy
Advanced Conversion Technologies · Under Construction
29.55.8 km
SC Johnson, Denby - Solar Panels
Solar Photovoltaics · Under Construction
0.628.4 km
Newstead and Annesley Wind Turbine
Wind Onshore · Operational
1.510.1 km
Willow Road - Roof mounted solar panels
Solar Photovoltaics · Operational
0.3510.4 km

How big is Newthorpe Wind Turbine?

Newthorpe Wind Turbine has a recorded installed capacity of 2.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Newthorpe Wind Turbine?

REPD records the operator as Severn Trent Water. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Newthorpe Wind Turbine approved and built?

The application was submitted on 2010-12-03. Permission was granted on 2011-07-15, 7 months later. The site became operational on 2014-04-08, 33 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3793.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council