Renewable sites › Newthorpe Wind Turbine
Newthorpe Wind Turbine
Newthorpe Wind Turbine is an operational 2.5 MW onshore wind farm in Broxtowe, generating since 8 April 2014. Planning permission was granted on 15 July 2011, 7 months after submission. Operator of record: Severn Trent Water.
Planning and build timeline
| Application submitted | 3 December 2010 |
| Permission granted | 15 July 2011 7 months after submission |
| Operational | 8 April 2014 33 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Broxtowe: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Newthorpe Wind Turbine’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
- Green Belt — Broxtowe
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 0.62 | 2.9 km |
Solar Photovoltaics · Under Construction | 17 | 4.8 km |
Solar Photovoltaics · Under Construction | 1 | 5.6 km |
Anaerobic Digestion · Operational | — | 5.6 km |
Advanced Conversion Technologies · Under Construction | 29.5 | 5.8 km |
Solar Photovoltaics · Under Construction | 0.62 | 8.4 km |
Wind Onshore · Operational | 1.5 | 10.1 km |
Solar Photovoltaics · Operational | 0.35 | 10.4 km |
How big is Newthorpe Wind Turbine?
Newthorpe Wind Turbine has a recorded installed capacity of 2.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Newthorpe Wind Turbine?
REPD records the operator as Severn Trent Water. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Newthorpe Wind Turbine approved and built?
The application was submitted on 3 December 2010. Permission was granted on 15 July 2011, 7 months later. The site became operational on 8 April 2014, 33 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3793.