Manners Avenue - Solar Panels
Manners Avenue - Solar Panels is operational in Erewash with a recorded capacity of 0.62 MW, and has been generating since 2022-05-01.
Planning and build timeline
| Application submitted | 2022-01-04 |
| Permission granted | 2022-10-06 9 months after submission |
| Operational | 2022-05-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Erewash’s record on solar
Erewash has decided 6 solar farms and approved 83%, taking a median of 2.7 months. See every solar farm decision in Erewash →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Pinnacle Storage Park, Dale Abbey - Solar PV Panels Solar Photovoltaics · Under Construction | 1 | 2.8 km |
Newthorpe Wind Turbine Wind Onshore · Operational | 2.5 | 2.9 km |
Crompton Road, Ilkeston - Anaerobic Digestion Plant Anaerobic Digestion · Operational | — | 3.8 km |
Long Lane Solar Farm / Nottingham Brick Works Solar Photovoltaics · Under Construction | 17 | 7.3 km |
Bulwell Energy Advanced Conversion Technologies · Under Construction | 29.5 | 8.1 km |
SC Johnson, Denby - Solar Panels Solar Photovoltaics · Under Construction | 0.62 | 8.4 km |
Derby Sewage Treatment Works Wind Onshore · Operational | 5 | 9.9 km |
Beeston Weir Hydro Scheme Small Hydro · Operational | 1.7 | 10.4 km |
How big is Manners Avenue - Solar Panels?
Manners Avenue - Solar Panels has a recorded installed capacity of 0.62 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Manners Avenue - Solar Panels?
REPD records the operator as Creed Food Service Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Manners Avenue - Solar Panels approved and built?
The application was submitted on 2022-01-04. Permission was granted on 2022-10-06, 9 months later. The site became operational on 2022-05-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10149.