Renewable sitesManners Avenue - Solar Panels

Manners Avenue - Solar Panels

Manners Avenue - Solar Panels is an operational 0.62 MW solar farm in Erewash, generating since 1 May 2022. Planning permission was granted on 6 October 2022, 9 months after submission. Operator of record: Creed Food Service Limited.

0.62 MW
Capacity
as recorded in REPD
Operational
Status
since 1 May 2022
Solar Photovoltaics
Technology
Creed Food Service Limited
Erewash
Authority
England

Planning and build timeline

Application submitted4 January 2022
Permission granted6 October 2022
9 months after submission
Operational1 May 2022

Screening a site of your own?

RedlineUK · £39

Erewash approves 83% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Manners Avenue - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Erewash’s record on solar

Erewash has decided 6 solar farms and approved 83%, taking a median of 2.7 months. See every solar farm decision in Erewash

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
12.8 km
Wind Onshore · Operational
2.52.9 km
Anaerobic Digestion · Operational
3.8 km
Solar Photovoltaics · Under Construction
177.3 km
Advanced Conversion Technologies · Under Construction
29.58.1 km
Solar Photovoltaics · Under Construction
0.628.4 km
Wind Onshore · Operational
59.9 km
Small Hydro · Operational
1.710.4 km

How big is Manners Avenue - Solar Panels?

Manners Avenue - Solar Panels has a recorded installed capacity of 0.62 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Manners Avenue - Solar Panels?

REPD records the operator as Creed Food Service Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Manners Avenue - Solar Panels approved and built?

The application was submitted on 4 January 2022. Permission was granted on 6 October 2022, 9 months later. The site became operational on 1 May 2022.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10149.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode