Willow Road - Roof mounted solar panels is operational in Nottingham with a recorded capacity of 0.35 MW, and has been generating since 2021-11-15.

0.35 MW
Capacity
as recorded in REPD
Operational
Status
since 2021-11-15
Solar Photovoltaics
Technology
AC Gill Limited
Nottingham
Authority
England

Planning and build timeline

Application submitted2021-06-17
Permission granted2023-02-23
20 months after submission
Operational2021-11-15

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Nottingham’s record on solar

Nottingham has decided 16 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Nottingham

Other built sites within 15 km

SiteMWDistance
Eastcroft EfW (Lines 1 & 2)
EfW Incineration · Operational
92.9 km
Eastcroft Municipal Depot
Solar Photovoltaics · Operational
0.182.9 km
Eastcroft Municipal Depot
Battery · Operational
0.62.9 km
Trent Basin Community Battery
Battery · Operational
0.53.6 km
Beeston Weir Hydro Scheme
Small Hydro · Operational
1.73.8 km
Fairham Business Park, Foresters Avenue - Roof Mounted Solar Panels
Solar Photovoltaics · Operational
0.365.8 km
Crompton Road, Ilkeston - Anaerobic Digestion Plant
Anaerobic Digestion · Operational
7.5 km
Radcliffe Solar Farm
Solar Photovoltaics · Operational
4.27.9 km

How big is Willow Road - Roof mounted solar panels?

Willow Road - Roof mounted solar panels has a recorded installed capacity of 0.35 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Willow Road - Roof mounted solar panels?

REPD records the operator as AC Gill Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Willow Road - Roof mounted solar panels approved and built?

The application was submitted on 2021-06-17. Permission was granted on 2023-02-23, 20 months later. The site became operational on 2021-11-15.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9326.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council