SC Johnson, Denby - Solar Panels is under construction in Amber Valley with a recorded capacity of 0.62 MW.

0.62 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
SC Johnson Professional Limited
Amber Valley
Authority
England

Planning and build timeline

Application submitted2022-05-25
Permission granted2022-09-12
4 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Amber Valley’s record on solar

Amber Valley has decided 15 solar farms and approved 67%, taking a median of 2.9 months. See every solar farm decision in Amber Valley

Other built sites within 15 km

SiteMWDistance
Pinnacle Storage Park, Dale Abbey - Solar PV Panels
Solar Photovoltaics · Under Construction
18.1 km
Manners Avenue - Solar Panels
Solar Photovoltaics · Operational
0.628.4 km
Newthorpe Wind Turbine
Wind Onshore · Operational
2.58.4 km
Meadow Lane Solar Farm
Solar Photovoltaics · Under Construction
19.69.4 km
Crow Trees Farm
Solar Photovoltaics · Operational
4.711.8 km
Twin Yards Solar Farm
Solar Photovoltaics · Operational
512 km
Crompton Road, Ilkeston - Anaerobic Digestion Plant
Anaerobic Digestion · Operational
12.2 km
Long Lane Solar Farm / Nottingham Brick Works
Solar Photovoltaics · Under Construction
1712.2 km

How big is SC Johnson, Denby - Solar Panels?

SC Johnson, Denby - Solar Panels has a recorded installed capacity of 0.62 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates SC Johnson, Denby - Solar Panels?

REPD records the operator as SC Johnson Professional Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was SC Johnson, Denby - Solar Panels approved and built?

The application was submitted on 2022-05-25. Permission was granted on 2022-09-12, 4 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11419.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council