Renewable sitesCrompton Road, Ilkeston - Anaerobic Digestion Plant

Crompton Road, Ilkeston - Anaerobic Digestion Plant

Crompton Road, Ilkeston - Anaerobic Digestion Plant is an operational anaerobic digestion plant in Erewash, generating since 1 April 2022. Planning permission was granted on 7 February 2022, 6 months after submission. Operator of record: Stanton Energy Limited.

Capacity
as recorded in REPD
Operational
Status
since 1 April 2022
Anaerobic Digestion
Technology
Stanton Energy Limited
Erewash
Authority
England

Planning and build timeline

Application submitted27 July 2021
Permission granted7 February 2022
6 months after submission
Operational1 April 2022
2 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Erewash: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Crompton Road, Ilkeston - Anaerobic Digestion Plant’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
0.623.8 km
Solar Photovoltaics · Under Construction
14.9 km
Wind Onshore · Operational
2.55.6 km
Small Hydro · Operational
1.76.7 km
Solar Photovoltaics · Operational
0.357.5 km
Solar Photovoltaics · Under Construction
178.4 km
Solar Photovoltaics · Operational
0.368.5 km
Advanced Conversion Technologies · Under Construction
29.58.5 km

How big is Crompton Road, Ilkeston - Anaerobic Digestion Plant?

REPD does not record an installed capacity for Crompton Road, Ilkeston - Anaerobic Digestion Plant.

Who operates Crompton Road, Ilkeston - Anaerobic Digestion Plant?

REPD records the operator as Stanton Energy Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Crompton Road, Ilkeston - Anaerobic Digestion Plant approved and built?

The application was submitted on 27 July 2021. Permission was granted on 7 February 2022, 6 months later. The site became operational on 1 April 2022, 2 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9510.