Renewable sitesCrompton Road, Ilkeston - Anaerobic Digestion Plant

Crompton Road, Ilkeston - Anaerobic Digestion Plant

Crompton Road, Ilkeston - Anaerobic Digestion Plant is operational in Erewash, and has been generating since 2022-04-01.

Capacity
as recorded in REPD
Operational
Status
since 2022-04-01
Anaerobic Digestion
Technology
Stanton Energy Limited
Erewash
Authority
England

Planning and build timeline

Application submitted2021-07-27
Permission granted2022-02-07
6 months after submission
Operational2022-04-01
2 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Manners Avenue - Solar Panels
Solar Photovoltaics · Operational
0.623.8 km
Pinnacle Storage Park, Dale Abbey - Solar PV Panels
Solar Photovoltaics · Under Construction
14.9 km
Newthorpe Wind Turbine
Wind Onshore · Operational
2.55.6 km
Beeston Weir Hydro Scheme
Small Hydro · Operational
1.76.7 km
Willow Road - Roof mounted solar panels
Solar Photovoltaics · Operational
0.357.5 km
Long Lane Solar Farm / Nottingham Brick Works
Solar Photovoltaics · Under Construction
178.4 km
Fairham Business Park, Foresters Avenue - Roof Mounted Solar Panels
Solar Photovoltaics · Operational
0.368.5 km
Bulwell Energy
Advanced Conversion Technologies · Under Construction
29.58.5 km

How big is Crompton Road, Ilkeston - Anaerobic Digestion Plant?

REPD does not record an installed capacity for Crompton Road, Ilkeston - Anaerobic Digestion Plant.

Who operates Crompton Road, Ilkeston - Anaerobic Digestion Plant?

REPD records the operator as Stanton Energy Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Crompton Road, Ilkeston - Anaerobic Digestion Plant approved and built?

The application was submitted on 2021-07-27. Permission was granted on 2022-02-07, 6 months later. The site became operational on 2022-04-01, 2 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9510.