Long Lane Solar Farm / Nottingham Brick Works
Long Lane Solar Farm / Nottingham Brick Works is under construction in Broxtowe with a recorded capacity of 17 MW.
Planning and build timeline
| Application submitted | 2015-07-22 |
| Permission granted | 2015-11-11 4 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
- Green Belt — Broxtowe
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Bulwell Energy Advanced Conversion Technologies · Under Construction | 29.5 | 1.5 km |
Newthorpe Wind Turbine Wind Onshore · Operational | 2.5 | 4.8 km |
Newstead and Annesley Wind Turbine Wind Onshore · Operational | 1.5 | 6.6 km |
Manners Avenue - Solar Panels Solar Photovoltaics · Operational | 0.62 | 7.3 km |
Burntstump Landfill Scheme Landfill Gas · Operational | 1.8 | 7.6 km |
Dorket Head Landfill Gas · Operational | 2.8 | 8 km |
Crompton Road, Ilkeston - Anaerobic Digestion Plant Anaerobic Digestion · Operational | — | 8.4 km |
Willow Road - Roof mounted solar panels Solar Photovoltaics · Operational | 0.35 | 9.3 km |
How big is Long Lane Solar Farm / Nottingham Brick Works?
Long Lane Solar Farm / Nottingham Brick Works has a recorded installed capacity of 17 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Long Lane Solar Farm / Nottingham Brick Works?
REPD records the operator as Earthworm/ EW Capital. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Long Lane Solar Farm / Nottingham Brick Works approved and built?
The application was submitted on 2015-07-22. Permission was granted on 2015-11-11, 4 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5603.